8.3  Canopy installation 

Recommendations how to prepare mounting holes in the foundation (the mounting 
surface) are given with regard to anchor bolts for solid concrete floors or similar 
foundations (see sect. 8.1). Use relevant mounting hardware for installation on different 
foundations. 
8.3.1  Unpack the canopy, check completeness of the delivery set according to sect. 4.1. 
8.3.2  Mark out the mounting holes for installation of the posts

 

(3) according to Fig. 4. 

 

Note: 

Carry out the marking together with that for turnstile mounting holes given 
in the Operational Manual to the 

RTD-15

Full Height Rotor Turnstile. Symmetry axis 

of turnstile and canopy mounting holes geometrically coincide (Figure 4). 

8.3.3  Prepare holes for the anchor bolts. Set the anchors all the way down the prepared 
holes. 

 

Warning! 

Further work should be carried out after installation of the turnstile. 
Be particularly careful when installing parts of the canopy before they are secured in 
place, prevent the parts from fall. 

8.3.4  Erect and fix the posts with anchor bolts observing their verticality by means of a 
level gauge, use insertions when necessary. 
8.3.5  Lay both roof sections side by side down a soft material (foam plastic, etc.) on a 
horizontal platform so that the jointing flanges (6) face each other, and the gap between 
the gussets (8) is 3-7 mm more than the length of the bushing (7). 
8.3.6  Put the screw 

М

8×45, through the hole in the left roof section gusset from inside, 

take the bushing on the screw. Put the screw inside the hole in the right roof section 
gusset (Fig. 5). Fix the screw by the nut M8 with two washers from inside the right roof 
section. Fix the other side gussets together. Do not tighten the screws. 
8.3.7  Tie the jointing flanges together by fittings shown in Fig. 5. Do not tighten the 
screws. 
8.3.8  Tighten all the screws jointing the roof sections: first in the gussets on one side 
together with the screws in the jointing flanges on the opposite side, then tighten the 
screws on the other sides. 
8.3.9  Lay the jointing strip (10) down a flat surface, stick the self-adhesive sealing 
element (9) along the long sides of the strip closest to the edge. Trim the sealing element 
where necessary. 
8.3.10  Lay the jointing strip along the joint line, the sealing element down. Drill 12 
Ø3.5 mm

 

holes 9 mm deep for the 4.2×16 self-tapping screw through the 12 Ø5 mm holes 

in the strip (Fig. 6). Fix the strip on the roof sections with the screws

 

 

10 

Summary of Contents for RTC-15

Page 1: ...ASSEMBLY AND OPERATION MANUAL WARRANTY CARD RTC 15 Protective Capony...

Page 2: ...Protective Canopy RTC 15 Assembly and Operation Manual Warranty Card...

Page 3: ...d on request 4 5 DESIGN 5 5 1 Main features 5 5 2 The canopy design 5 6 MARKING AND PACKAGING 7 7 SAFETY REQUIREMENTS 7 7 1 Installation safety requirements 7 7 2 Operational safety requirements 7 8 I...

Page 4: ...ance with this Manual 1 APPLICATION The RTC 15 Protective canopy the canopy is designed for use together with the RTD 15 Full height rotor turnstile the turnstile as protection of the turnstile agains...

Page 5: ...d with optional equipment fittings used in the canopy installation depending on adjacent equipment Mounting brackets Connecting posts Note This Manual gives information on attachment of the canopy to...

Page 6: ...ight and left names for the roof sections are conventional and correspond to the name of the RTD 15 turnstile guide barrier section Fig 4 and 8 below see Operation Manual for the RTD 15 full height ro...

Page 7: ...re 3 The canopy design 1 right roof section 2 left roof section 3 post 4 bottom flange 5 top flange 6 jointing flanges 7 bushing 8 gussets 9 sealing element 10 jointing strip 11 drain The bushing and...

Page 8: ...REQUIREMENTS 7 1 Installation safety requirements Installation of the canopy should be carried out by qualified personnel only in strict accordance with this Manual and general requirements for insta...

Page 9: ...advise installation to be carried by at least two persons in assembly and installation work mounting the canopy on flat solid concrete floors grade 400 or higher stone or similar foundations at least...

Page 10: ...rnstile barrier section L mounting point of the turnstile left guide barrier section R mounting point of the turnstile right guide barrier section Figure 4 shows a sketch layout of the turnstile mount...

Page 11: ...e insertions when necessary 8 3 5 Lay both roof sections side by side down a soft material foam plastic etc on a horizontal platform so that the jointing flanges 6 face each other and the gap between...

Page 12: ...Protective Canopy RTC 15 Figure 5 Juncture of the roof sections 1 and 2 Figure 6 Assembled roof 11...

Page 13: ...inting flanges to adjacent equipment 8 3 13 1 when the canopy is used together with a standalone turnstile without railings fix it to the turnstile top channel by two Turnstile Canopy brackets mounted...

Page 14: ...em by nuts with washers from inside the top channel as shown in Fig 9 8 3 14 9 Tighten all the bracket screws 8 3 15 In the same way mount the Turnstile Canopy bracket from the side of the turnstile g...

Page 15: ...or other closed type cargo transport During storage and transportation the boxes can be stacked no more than 2 layers high The canopy should be stored indoors at ambient temperatures between 40 to 45...

Page 16: ...tc fuses accumulators galvanic elements and other components replacement of which is performed by the Customer in accordance with the Product s in line documentation To the maximum extent permitted by...

Page 17: ...y claims with regard to the technical specifications of the Product in case they are in compliance with those stated by the Manufacturer The Manufacturer does not guarantee that the Product purchased...

Page 18: ...e of sale ____________________201___ ____________________________________ signature seal Cutting line WARRANTY REPAIR COUPON RTC 15 Protective Canopy for RTD 15 Full Height Rotor Turnstile Date of man...

Page 19: ......

Page 20: ......

Page 21: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Page 22: ...www perco com...

Reviews: