Assembly and Operation Manual
8.3 Canopy installation
Recommendations how to prepare mounting holes in the foundation (the mounting
surface) are given with regard to anchor bolts for solid concrete floors or similar
foundations (see sect. 8.1). Use relevant mounting hardware for installation on different
foundations.
8.3.1 Unpack the canopy, check completeness of the delivery set according to sect. 4.1.
8.3.2 Mark out the mounting holes for installation of the posts
(3) according to Fig. 4.
Note:
Carry out the marking together with that for turnstile mounting holes given
in the Operational Manual to the
RTD-15
Full Height Rotor Turnstile. Symmetry axis
of turnstile and canopy mounting holes geometrically coincide (Figure 4).
8.3.3 Prepare holes for the anchor bolts. Set the anchors all the way down the prepared
holes.
Warning!
Further work should be carried out after installation of the turnstile.
Be particularly careful when installing parts of the canopy before they are secured in
place, prevent the parts from fall.
8.3.4 Erect and fix the posts with anchor bolts observing their verticality by means of a
level gauge, use insertions when necessary.
8.3.5 Lay both roof sections side by side down a soft material (foam plastic, etc.) on a
horizontal platform so that the jointing flanges (6) face each other, and the gap between
the gussets (8) is 3-7 mm more than the length of the bushing (7).
8.3.6 Put the screw
М
8×45, through the hole in the left roof section gusset from inside,
take the bushing on the screw. Put the screw inside the hole in the right roof section
gusset (Fig. 5). Fix the screw by the nut M8 with two washers from inside the right roof
section. Fix the other side gussets together. Do not tighten the screws.
8.3.7 Tie the jointing flanges together by fittings shown in Fig. 5. Do not tighten the
screws.
8.3.8 Tighten all the screws jointing the roof sections: first in the gussets on one side
together with the screws in the jointing flanges on the opposite side, then tighten the
screws on the other sides.
8.3.9 Lay the jointing strip (10) down a flat surface, stick the self-adhesive sealing
element (9) along the long sides of the strip closest to the edge. Trim the sealing element
where necessary.
8.3.10 Lay the jointing strip along the joint line, the sealing element down. Drill 12
Ø3.5 mm
holes 9 mm deep for the 4.2×16 self-tapping screw through the 12 Ø5 mm holes
in the strip (Fig. 6). Fix the strip on the roof sections with the screws
.
10
Summary of Contents for RTC-15
Page 1: ...ASSEMBLY AND OPERATION MANUAL WARRANTY CARD RTC 15 Protective Capony...
Page 2: ...Protective Canopy RTC 15 Assembly and Operation Manual Warranty Card...
Page 19: ......
Page 20: ......
Page 22: ...www perco com...