Assembly and Operation Manual
8 INSTALLATION WORK
8.1 General recommendations
Installation is an operation substantially responsible for durability and serviceable life of the
canopy. Study this section carefully before commencing the installation work, and strictly
follow the instructions.
Warning!
The manufacturer will not accept liability for any damage to the canopy
or other equipment, or otherwise loss caused as a result of improper installation, and
will dismiss any claims by the customer should the installation work be carried out
not in accordance with this Manual.
We advise:
installation to be carried by at least two persons in assembly and installation work;
mounting the canopy on flat, solid concrete floors (grade 400 or higher), stone or
similar foundations at least 150 mm thick;
using reinforcing elements 500×500×500
mm for weaker foundations;
using mounting hardware as recommended in sect. 4.2
8.2 Installation tools
Use the following tools for the installation work:
1.2
1.5 kW electric perforator;
0.6
к
W electric drill;
Ø16 mm carbide drill bits;
Ø3.5 and Ø8.5 mm drill bits;
S10; S13; S17
horn wrenches;
S5; S6
hex-nut wrenches;
N2
cross-tip screwdriver, 150 mm;
pair of trammels
;
3 m tape-measure;
level
gauge;
two stepladders (four steps or more).
Note:
Use of other similar tools is allowed as long as it does not reduce quality of the
installation work.
8
Summary of Contents for RTC-15
Page 1: ...ASSEMBLY AND OPERATION MANUAL WARRANTY CARD RTC 15 Protective Capony...
Page 2: ...Protective Canopy RTC 15 Assembly and Operation Manual Warranty Card...
Page 19: ......
Page 20: ......
Page 22: ...www perco com...