![background image](http://html1.mh-extra.com/html/pepperl-fuchs/visunet-gmp-pc219/visunet-gmp-pc219_hardware-manual_1527816038.webp)
2018-07
38
VisuNet GMP RM/PC 200 series
Installation and Commissioning
1. Screw the cable glands with a fork wrench.
2. To plug up cable glands that are not in use, lightly tighten the cable gland
3. Plug the plugs in.
4. Firmly thighten the cable gland.
3.6
Mounting to wall bracket
Fixing the screws for wall bracket on the wall
1. Place the drill holes on the wall. Therefor use the drilling template C.
2. Attach the 4 screws (M8).
Running cable through wall bracket/VESA plate
1. Depending on cable diameter, choose the adequate cable gland (e.g. 1 cable gland for sup-
ply cable, 1 cable gland for network cable).
2. Feed the cable through the wall bracket as shown.
Note!
Fuchs recommand to use a cable with a core-cross section of 4 mm
2
for grounding.
Note!
For fastening the wall bracket, use 4 screws (M8) which suit the soil conditions.
Ø
17
280
9
15
105
C