![Pepperl+Fuchs VAZ-2E2A-G20-ZPA1 Manual Download Page 25](http://html1.mh-extra.com/html/pepperl-fuchs/vaz-2e2a-g20-zpa1/vaz-2e2a-g20-zpa1_manual_1527690025.webp)
2
0
1
8
-0
6
24
Installation
3
Installation
3.1
Safety Information
3.2
Preparation
Unpacking the unit
1. Check that all package contents are present and undamaged.
If anything is damaged, inform the shipper and contact the supplier.
2. Check that all items are present and correct based on your order and the shipping
documents.
If you have any questions, please contact Fuchs.
3. Keep the original packing material in case you need to store or ship the unit at a later time.
3.3
Mounting
Figure 3.1
Set the rotary switches S1...S3 as per their desired application. (see Chapter "Product
Description", Subsection "Indicators and Operating Elements").
Caution!
Risk of short circuit
Carrying out work while the system is energized may result in damage to the device.
■
Always disconnect the supply voltage before carrying out work on the device.
■
Only connect the device to the supply voltage once all work has been completed.
Note!
Note the Mounting Direction of the ZPA Motor Control Module
The ZPA motor control module is designed to be mounted between two conveyor zones. The
mounting direction is such that the LEDs always point downward and the hinged cable guide
upward. This ensures the correct assignment of the connected zones (right zone -> right-side
connection, left zone -> left-side connection).
X1
X2
IN1
MOT1
IN2
MOT2
P
W
R
X
1
IN
X
1
O
U
T
X
2
IN
X
2
O
U
T
M
O
T
1
M
O
T
2
E
R
R
1
E
R
R
2
IN
1
IN
2
12
3
4 5 6 7
8
90
12
3
4 5 6 7
8
90
12
3
4 5 6 7
8
90
S3
S2
S1