6

IntelliChlor Electronic Chlorine Generator COMSYS-10 Installation Guide

Assemble the Manifold

1. Place an o-ring into groove on union coupling.

2. Place each cell on the manifold and tighten coupling nut securely.  Be sure the o-ring stays

in place. Note: Cells labeled PRIMARY and SECONDARY can be placed anywhere in
the manifold, they do not need to be in a specific location.

3. Glue the manifold into the system plumbing at desired location, either horizontal or vertical.

Make sure the cells are readable and the buttons can be pressed if needed.
CAUTION: Do not install upside down!

4. Verify water flow direction See the FLOW arrow located on the IntelliChlor cell near the

input coupling.

IMPORTANT! MANIFOLD ASSEMBLY AND INTELLICHLOR CELL MUST BE

INSTALLED IN THE VERTICAL POSITION, AS SHOWN BELOW.

Glue the manifold

6.

Glue manifold into system plumbing at the desired location.  The manifold will sit on the floor. Be sure

the cells are readable and the buttons can be pressed if needed. Do not install upside down!

7. Verify water flow direction.

O-ring

Union coupling nut

Coupling

Manifold

Outlet

Inlet

Drain

Stand

Spacer

DO NOT MIX OLD AND
NEW MANIFOLD PARTS.
MANIFOLD
DIMENSIONS MAY NOT
BE BACKWARDS
COMPATIBLE.

Summary of Contents for 520974

Page 1: ...IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS INTELLICHLOR SALT CHLORINATOR COMMERCIAL SYSTEM COMSYS 10 P N 520974 INSTALLATION GUIDE...

Page 2: ...hours Comsys 10 5 cell 1 primary and 4 secondary produces ten pounds of chlorine per day The ORP system not provided is a separate device that monitors the available chlorine in the water and when ne...

Page 3: ...E PROCEEDING IMPORTANT SAFETY PRECAUTIONS PLEASE READ THE FOLLOWING Read all the safety precautions in this manual before attempting any electrical wiring Be sure to read and follow all safety Instruc...

Page 4: ...REAKER to the junction box Note ThisAC power should be on its own breaker for future servicing Note For 110VAC operations each power center will need to be re configured A 110VAC wiring diagram is pro...

Page 5: ...abeled WIRED FOR 220V Do not applyAC power yet 5 Connect the two 2 twisted wires labeled ORP SENSOR to the ORP chlorine controller panel AcuTrol etc not included in kit Carefully place the connection...

Page 6: ...t the two wires from the CPC202 into terminal block in same order as the wires already connected Be sure to match the wire colors GREEN to GREEN and YELLOW to YELLOW 10 Replace the cover on the upper...

Page 7: ...and the buttons can be pressed if needed CAUTION Do not install upside down 4 Verify water flow direction See the FLOW arrow located on the IntelliChlor cell near the input coupling IMPORTANT MANIFOL...

Page 8: ...r on the receptacle turn it slowly until the plug pins are inserted into the receptacle then twist it to lock it in place 2 Plug the four SECONDARY cell power connectors into each of the power centers...

Page 9: ...de PRIMARY SECONDARY SECONDARY Terminal Screw Connector CPC203 CPC103 SECONDARY SECONDARY Power Centers The PRIMARY and SECONDARYpower centers have been pre wired with communication wires as shown bel...

Page 10: ...is flashing the cell has become dirty and requires acid cleaning Turn off the circuit breaker to the power centers disable water flow through the manifold either an external valve or turn off the filt...

Page 11: ...h salt is in the water to produce chlorine cell is OFF 1 Add salt to the water and bring up to 3600ppm Allow it to mix for 24 hours 2 The salt level will be checked every 8 hours by the cells and disp...

Page 12: ...ion in order to minimize the corrosion and deterioration that is inherent in and around salt water pools PENTAIR WATER POOL AND SPA INC 1620 HAWKINS AVE SANFORD NC 27330 919 566 8000 10951 WEST LOS AN...

Reviews: