Troubleshooting

The IntelliChlor 100% light does not come on when the chlorine controller calls for chlorine

1. Verify the ORP controller is opening and closing the dry-contact output.

2. Remove the ORP SENSOR wires connection from the PRIMARY power center and the ORP

controller.  Manually tie the ORP SENSOR wires together.  This will turn on the cells at 100%.  If
the 100% lights do not come on for each cell or only one cell, verify the communication wires are
connected, shown in POWER UP THE SYSTEM, step 3, page 7.

The IntelliChlor 100% light stays on after the chlorine controller says to stop

1. Verify the communication wires are connected, as shown in section 5, POWER UP THE SYSTEM,

step 3.

2. Verify the ORP SENSOR wires are not shorted together in the power center.

3. Verify the ORP controller dry contact output is opening and closing by using an ohmmeter.

Manually set this output open and closed using the controller menu system.

The CHECK SALT light is on

More salt needs to be added to the water.

1. Add salt to the water and bring up to 3600ppm.  Allow it to mix for 24 hours.

2. The salt level will be automatically checked every 8 hours by the primary cell and displayed.

The LOW salt light is on

Not enough salt is in the water to produce chlorine, cell is OFF.

1. Add salt to the water and bring up to 3600ppm.  Allow it to mix for 24 hours.

2. The salt level will be checked every 8 hours by the cells and displayed.

Not enough chlorine is produced

1. Ensure the ORP sensor probe on the chlorine controller unit is clean and working.

2. Verify the IntelliChlor cells do not have a flashing CELL light.  If so, remove the cell and acid clean.

3. Verify no debris is in the cells.  Remove if present.

4. Verify the FLOW light is green, for adequate water flow.

5. Verify the salt level lights are displaying either green GOOD or yellow CHECK SALT.  If displaying

yellow CHECK SALT, add salt to the water, and allow to mix for 24 hours.

6. Verify the ORP controller sets the cells to 100% SANITIZER OUTPUT or 0%, by manually

controlling this output relay (done in the ORP controller, not the IntelliChlor) or by disconnecting
the ORP SENSOR wires from the power center and manually opening and closing the wires.

7. Verify the ORP probe is clean.

8. Verify the filter pump is not being turned off by a timer.

The cell is not powered up

1. Check fuse, replace if open. 2.

Check if cell connector is plugged and twist-locked all the way in.

Fuse is blown

1. Replace with 12 amp ceramic fuse.  DO NOT USE 10AMP glass (a common fuse), it is not reliable and

might fail later. If the fuse blows again, replace the cell.

2. Verify the Power center is not wired for 110VAC and has 220VAC applied to it.  THIS IS NOT COVERED

BY THE WARRANTY.

Summary of Contents for 520974

Page 1: ...IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS INTELLICHLOR SALT CHLORINATOR COMMERCIAL SYSTEM COMSYS 10 P N 520974 INSTALLATION GUIDE...

Page 2: ...hours Comsys 10 5 cell 1 primary and 4 secondary produces ten pounds of chlorine per day The ORP system not provided is a separate device that monitors the available chlorine in the water and when ne...

Page 3: ...E PROCEEDING IMPORTANT SAFETY PRECAUTIONS PLEASE READ THE FOLLOWING Read all the safety precautions in this manual before attempting any electrical wiring Be sure to read and follow all safety Instruc...

Page 4: ...REAKER to the junction box Note ThisAC power should be on its own breaker for future servicing Note For 110VAC operations each power center will need to be re configured A 110VAC wiring diagram is pro...

Page 5: ...abeled WIRED FOR 220V Do not applyAC power yet 5 Connect the two 2 twisted wires labeled ORP SENSOR to the ORP chlorine controller panel AcuTrol etc not included in kit Carefully place the connection...

Page 6: ...t the two wires from the CPC202 into terminal block in same order as the wires already connected Be sure to match the wire colors GREEN to GREEN and YELLOW to YELLOW 10 Replace the cover on the upper...

Page 7: ...and the buttons can be pressed if needed CAUTION Do not install upside down 4 Verify water flow direction See the FLOW arrow located on the IntelliChlor cell near the input coupling IMPORTANT MANIFOL...

Page 8: ...r on the receptacle turn it slowly until the plug pins are inserted into the receptacle then twist it to lock it in place 2 Plug the four SECONDARY cell power connectors into each of the power centers...

Page 9: ...de PRIMARY SECONDARY SECONDARY Terminal Screw Connector CPC203 CPC103 SECONDARY SECONDARY Power Centers The PRIMARY and SECONDARYpower centers have been pre wired with communication wires as shown bel...

Page 10: ...is flashing the cell has become dirty and requires acid cleaning Turn off the circuit breaker to the power centers disable water flow through the manifold either an external valve or turn off the filt...

Page 11: ...h salt is in the water to produce chlorine cell is OFF 1 Add salt to the water and bring up to 3600ppm Allow it to mix for 24 hours 2 The salt level will be checked every 8 hours by the cells and disp...