background image

9

 ENGLISH

Thermostat connection with explosion 

protection

The thermostats are to be connected in such a way that the 
motor is switched off via the control circuit when the response 
temperature is reached. It must not be possible for the motor 
to switch on again automatically after the winding has cooled 
down.

WARNING!

After an automatic cut-out via the temperature limiters, the 

cause of the malfunction must first be eliminated. Only then 

may the motor be switched on again manually.
The restart interlock must be "non-resetting on power failure", 
i.e. the lock must be in place to prevent restarting even after a 
power cut (in Europe: Directive 2014/34/EU, Appendix II 1.5, EN 
60079-17 Table1, B10).

Operation with frequency converter

Frequency converters may only be used for controlling the fre-
quency of special models of three-phase pumps. Alternating 
current pumps are unsuitable as a rule.

NOTICE! 

For physical reasons, pumps may not be operated at a 

higher frequency than that shown on the type plate. If the fre-
quency increases beyond the value on the type plate, the pow-
er input increases and the motor is then overloaded.

For special models of three-phase pumps that are designed for 
frequency converter operation, the motor type shown on the 
type plate is labelled with an additional "K" (e.g. D90-2/75 CK).
These pumps also have a sticker on the end of the cable that 
indicates their suitability for use with a frequency converter.

These special motors are fitted with PTC thermistors as wind

-

ing protectors. Voltages of more than 2.5 V may not be con-
nected to the winding protection terminals 40 and 41! For 
explosion protected pumps, a type-tested tripping unit that 
complies with the EU type-testing requirements is also neces-
sary.

Rotational direction

Not applicable for alternating current pumps. The rotational 
direction must be checked before installation! If the rotational 
direction is correct, the start-up jolt should be in the opposite 
direction to the rotational direction arrow on the motor hous-
ing. The wrong rotational direction is also indicated if the pump 
performs inadequately when installed, or if loud noises can be 
heard during operation. If the rotational direction is wrong, 2 
phases of the supply cable must be swapped over. 

CAUTION!

The start-up jolt can be very forceful. 

Potential equalisation

To comply with EN 60079-14 and EN 1127-1, an additional equi-
potential bonding must be installed for facilities with protec-
tive earth conductors in TN/TT networks in areas subject to 
explosion hazards. In Germany, for example, the design must 
be in accordance with VDE 0100, Part 540 (Association of Ger-
man Electrical Engineers).
No additional potential equalisation is required on site for Pen-
tair Jung Pumpen concrete or plastic chambers in explosion 
zones 1 and 2 (statement made by TÜV Nord (Technical Inspec-
tion Agency) in March 2008).

Exception: if conductive parts, such as cable protection 
sleeves made of corrugated pipe or a pressure pipe made of 
metal, are connected to the chamber from the outside. In this 
case, an electrically conductive connection must be made be-
tween the conductive parts and the housing of the pump(s). 
For corrosion protection reasons, the connection should be 
made using stainless steel.
Explosion protected pumps have a special connection point at 
the cable entry point. 

INSTALLATION

The pump must be installed as shown in the examples. For in-
stallations in accordance with EN 12056-4, the pressure pipe 
must be laid in a loop above the local back pressure level and 
protected with a back pressure valve.

Example installation 

with guide rail system 

Assembly:

 Fix the coupling base firmly to the floor of the col

-

lection chamber using plugs and then mount the guide rails. 

Next, install the pressure pipe including the necessary fittings, 

such as the non-return valve and shut-off valves. 

Finally, fit the pump with the screwed-on coupling catch on to 
the guide rails and lower it into place using a chain fixed to the 

shackle.

A  fixing  facility  for  lifting  gear  should  be  provided  above  the 
chamber opening at a sufficient height.

Level monitoring can be carried out using various systems. 

Their specific characteristics and requirements can be found 

in the relevant operating manuals.

WARNING!

In accordance with the explosion protection laws and regula-
tions, JUNG Ex-pumps should never be allowed to run dry or to 
operate in "snore" mode. 
The pump must switch off when the water level sinks to the 
upper edge of the pump housing (x in the illustration), at the 
very latest. This shut-down must be implemented via a sepa-
rate switching circuit. Dry running for servicing or inspection 
purposes may only take place outside the potentially explosive 
area.
A correspondingly larger diameter pipe should be used for 
longer pressure pipelines to avoid pipe friction losses. 
Rising pressure pipes must be protected from frost! A cham-
ber cover must be selected that is suitable for the intended use 
and has the required load-bearing capacity.

Summary of Contents for MULTICUT 25/2 ME

Page 1: ...ctions de service NL Gebruikshandleiding IT Istruzioni per l uso PL Instrukcja eksploatacji CZ N vod pro provoz SK N vod na prev dzku HU zemeltet si tmutat RO Manual de utilizare MULTICUT 25 2 ME 35 2...

Page 2: ...Sym bolen besonders gekennzeichnet NichtbeHinweis kann ge f hrlich werden Allgemeine Gefahr f r Personen Warnung vor elektrischer Spannung HINWEIS Gefahr f r Maschine und Funktion Personalqualifikatio...

Page 3: ...Kurzzeitbetrieb S2 s Techn Daten Motor aufgetaucht Aussetzbetrieb S3 s Techn Daten Bei Lagerung im Trockenen ist die Tauchpumpe bis 20 C frostsicher Eingebaut darf sie im Wasser jedoch nicht einfrie...

Page 4: ...getauscht werden VORSICHT Der Anlaufruck kann mit gro er Kraft erfolgen Potentialausgleich Nach EN 60079 14 und EN 1127 1 muss in explosionsgef hr deten Bereichen bei Betriebsmitteln mit Schutzleiter...

Page 5: ...lkammer ist durch eine Verschlussschraube nach au en abgedichtet Zur Kontrolle der Gleitringdichtung wird das l der lkammer einschlie lich der Restmenge abgelassen und in einem sauberen Messbecher au...

Page 6: ...erst Druckst ck und Schneidrotor entfernt wie oben be schrieben Dann werden die 4 Innensechskantschrauben her ausgedreht und das Spiralgeh use abgenommen Laufrad und Spiralgeh use k nnen jetzt gereini...

Page 7: ...g of electrical voltage NOTICE Danger to equipment and operation Qualification and training of personnel All personnel involved with the operation servicing inspection and installation of the equipmen...

Page 8: ...must not be allowed to freeze in the water Transport The pump must always be lifted by the handle and never by the power supply cable The pump should only be lowered by using a rope or chain ELECTRICA...

Page 9: ...al bonding must be installed for facilities with protec tive earth conductors in TN TT networks in areas subject to explosion hazards In Germany for example the design must be in accordance with VDE 0...

Page 10: ...etrofit the electrode of our DKG or DKG Ex seal leak control device in place of the DKG sealing screw Changing the oil To ensure operational liability the first oil change should be carried out after...

Page 11: ...and adjust the cutting clearance To clean the pump chamber a flushing pipe can be fitted as and when required To do so the Luft air sealing screw is remo ved and in its place the flushing pipe fitted...

Page 12: ...ion Le non respect des consignes de s curit peut entra ner la perte de tous les droits r paration du dommage Dans ces instructions de service les consignes de s curit sont identifi es de mani re parti...

Page 13: ...nt sur la s curit lors de la mise en ser vice d installations n cessitant un contr le et sur l organisation de la s curit et de la sant des travailleurs article 1 du d cret sur la s curit des exploita...

Page 14: ...ur les pompes protection antid flagration il faut en plus un d clencheur au type de construction contr l et qui tient compte des exigences de l examen EU de type Sens de rotation Neconcernepaslespompe...

Page 15: ...tec tion enveloppe antid flagrante Seuls les entreprises homo logu es ou le fabricant auront l autorisation d effectuer les travaux de remise en tat influen ant la protection antid flag rante Lors des...

Page 16: ...le il faut d abord retirer la plaque d appui et le rotor de coupe comme d crit ci dessus On d visse ensuite les 4 vis six pans creux et retire la volute en spirale Il est maintenant possible de proc d...

Page 17: ...aak op schadervergoeding vervallen In deze handleiding zijn de veiligheidsinstructie extra aange geven met symbolen Het niet opvolgen kan tot gevaarlijke si tuaties leiden Algemeen gevaar voor persone...

Page 18: ...al van 40 C Motor gedompeld Continugebruik S1 Motor uit het water gehaald Kort gebruik S2 zie Technische gegevens Motor uit het water gehaald Uitschakelgebruik S3 zie Techni sche gegevens Wanneer opge...

Page 19: ...randaarde in het TN TT netwerk een aanvullende potentiaalvereffening worden ge nstalleerd Ontwerpspecificatie in Duitsland bijvoorbeeld con form VDE 0100 deel 540 Voor beton en plastic schachten van P...

Page 20: ...d Ter controle van de oliekeerringafdichting wordt de olie uit de oliekamer met inbegrip van de resterende hoe veelheid afgetapt en verzameld in een schone maatbeker Als de olie doordrenkt is met wate...

Page 21: ...rboven beschreven Vervolgens worden de 4 inbusschroeven eruit ge draaid en het slakkenhuis eraf gehaald Waaier en slakkenhuis kunnen nu worden gereinigd Daarna worden de afzonderlijke delen gemonteerd...

Page 22: ...curezza sono contrassegnate con determinati simboli L inosservanza pu essere pericolosa Pericolo generico per le persone Pericolo tensione elettrica Avviso Pericolo per macchinari e funzionamento Qual...

Page 23: ...o S1 Motore emerso funzionamento per breve tempo S2 ved specifiche tecniche Motore emerso funzionamento intermittente S3 ved speci fiche tecniche In caso di deposito all asciutto la pompa sommersa sic...

Page 24: ...u verificarsi con maggiore forza Collegamento equipotenziale Secondo la EN 60079 14 e EN 1127 1 nelle aree a pericolo di esplosione in cui sono presenti mezzi di produzione con cavi di protezione nell...

Page 25: ...cambio dell olio Dopo altre 300 ore di funzionamento ma max dopo 6 mesi controllare nuovamente Se nell olio presente troppa acqua e materiali inquinanti necessario sostituire l olio e la tenuta mecca...

Page 26: ...La girante e l alloggiamento a spirale possono ora essere puliti Quindi rimontare le singole parti e impostare il gioco di taglio Per la pulizia del pozzo di pompaggio possibile installare in seguito...

Page 27: ...trukcje bezpiecze stwa znako wane s w spos b szczeg lny Ich ignorowanie mo e powodo wa wyst pienie zagro enia Og lne zagro enie dla os b Ostrze enie przed napi ciem elek trycznym Notyfikacja Zagro eni...

Page 28: ...nurzony Praca przerywana S3 patrz dane technicz ne Przy magazynowaniu w warunkach suchych pompa jest odporna na mr z do 20 C Jednak zanurzona mo e w wodzie zamarzn Transport Pompa powinna by podnoszon...

Page 29: ...e np w Niemczech wed ug VDE 0100 cz 540 Dla studzienek betonowych i plastikowych firmy Pentair Jung Pumpen w strefie wybuchowej 1 oraz 2 dodatkowe lokalne system wyr wnania potencja u nie jest koniecz...

Page 30: ...omory olejowej mo na zamontowa dodatkowo elektrod naszego urz dzenia s u cego do kon troli szczelno ci DKG lub DKG Ex i wkr ci j w miejsce rubki za lepiaj cej z napisem DKG Wymiana oleju Celem utrzyma...

Page 31: ...powej mo na dodatkowo zainstalowa rur p ucz c W tym celu nale y wykr ci rub zamykaj c Luft Powietrze i na jej miejsce zamontowa rur p ucz c NOTYFIKACJA Przy odkr ceniu niew a ciwych rub dojdzie do wyc...

Page 32: ...pe pro stroje a funkce Kvalifikace person lu Person l pro obsluhu dr bu kontrolu a mont mus m t od pov daj c kvalifikaci pro tyto pr ce a b t dostate n informo v n na z klad studia N vodu pro provoz O...

Page 33: ...ny po adavky potvrzen o zkou ce konstruk n ho modelu EU OZN MEN Elektrick pr ce na erpadle nebo zen sm prov d t jen kvalifikovan elektrik Musej b t dodr eny p slu n platn normy nap EN speci ln vnitro...

Page 34: ...esem erpadla erpadel Z d vod ochrany proti korozi by m la b t pro vytvo en spojen pou ita nerezov ocel erpadla chr n n proti explozi jsou pro toto opat ena mo nost p ipojen na kabelov veden MONT P i i...

Page 35: ...je v dy po 1000 hodin ch provozu P i ni m po tu hodin provozu v ak prov st v m nu oleje nej m n jednou za rok Jestli e je p epravov na odpadn voda se siln abrazivn mi p m semi je nutn po tat s v m nou...

Page 36: ...elem vy i t n stanice erpadla je mo n tak dodate n instalovat vyplachovac trubku Za t m elem odstranit uzav rac roub Luft vzduch a na erpadle namontovat vyplacho vac trubku Ozn men P i povolen nespr...

Page 37: ...zpe n V eobecn nebezpe enstvo pre osoby V straha pred elektrick m nap t m Ozn menie Nebezpe enstvo ohrozenia stroja a jeho funkcie Kvalifik cia person lu Person l vykon vaj ci obsluhu dr bu rev zie a...

Page 38: ...dorn do 20 C Nain talovan erpadlo v ak nesmie vo vode zamrzn Preprava erpadlo sa m dv ha z sadne prostredn ctvom r ky a nie pr vodn m k blom Sp anie erpadla do hlb ch cht alebo j m vykon vajte len za...

Page 39: ...dato n miestne vyrovnanie potenci lu vyjadrenie T V Nord 03 2008 V nimka Ke vodiv diely napr ochrana k bla z vlnit ho kom penz tora alebo kovov v tla n r ra ved na pripojen achty V takomto pr pade mus...

Page 40: ...ja po ka d ch 1000 prev dzkov ch hodin ch Pri men om po te prev dzkov ch hod n je v ak potrebn olej vymie a minim lne jedenkr t za rok Ak sa erp odpadov voda so silne abraz vnymi pr mesami je potrebn...

Page 41: ...adl mo no aj dodato ne nai talova vyplachovaciu r rku K tomu sa odstr ni uzatv racia skrutka Luft vzduch a na erpadle sa namontuje vyplachovacia r rka Ozn menie Pri uvo nen nespr vnych skrutiek vyte i...

Page 42: ...az zemeltet si tmutat ban a k l nb z t pus biz tons gi utas t sokat az al bbi szimb lumokkal emelt k ki Ezen utas t sok be nem tart sa vesz lyes ltal nos szem lyi s r l s vesz ly Vesz lyes fesz lts g...

Page 43: ...efagyjon a v zbe Sz ll t s A pumpa alapvet en a foganty n l s nem a bevezet vezet k n l emelend M ly akn ba vagy rokba a szivatty t csak k t l vagy l nc seg ts g vel szabad leengedni VILLAMOSCSATLAKOZ...

Page 44: ...m anyag nyom cs k v lr l az akna csatlakoztat s hoz vezetnek Ebben az esetben elektromos vezet kapcso latot kell kialak tani a pumpa pump k foglalat val A csat lakoz s l trehoz s hoz korr zi v delmi...

Page 45: ...n rz k sz l k nk elektr d ja a DKG dug csavar hely re Olajcsere A m k d sbiztons g fenntart sa rdek ben le kell cser lni az olajat el sz r 300 zem ra ut n majd 1000 zem r nk nt Enn l kisebb zem rasz m...

Page 46: ...nnak hely re szerelje fel a mos cs vet a pump ra RTES T S Rossz csavarok kicsavar sa eset n kifolyik az olaj az olajkamr b l MA megh z si nyomat kok A2 szerkezeti anyag csavarokn l M 6 eset ben MA 8 N...

Page 47: ...ubire n cadrul acestui manual de utilizare instruc iunile de siguran sunt marcate n mod special prin simboluri Nerespectarea lor poate fi periculoas Pericol general pentru persoane Aten ionare pentru...

Page 48: ...40 C motor scufundat func ionare continu S1 motor aflat la suprafa func ionare pe termen scurt S2 vezi Date tehnice motor aflat la suprafa func ionare intermitent S3 vezi Date tehnice La depozitarea p...

Page 49: ...lului de alimentare PRECAU IE Impulsul de pornire poate fi foarte puternic Egalizare de poten ial Conform EN 60079 14 i EN 1127 1 n zonele cu pericol de ex plozie trebuie instalat un egalizator de pot...

Page 50: ...lei Dup alte 300 ore de func ionare maxim ns dup 6 luni trebuie efectuat o noua verificare Dac la ulei s a infiltrat ap i impurit i pe l ng ulei tre buie nlocuit i garnitura de etan are cu inel de alu...

Page 51: ...cum cur ate Dup aceea se monteaz din nou p r ile componente i se regleaz distan a de t iere Pentru cur area pu ului pompei se poate instala i ulterior un tub de cl tire n acest scop se ndep rteaz urub...

Page 52: ...Bestanden der Hebewirkung Bestanden der mechanischen Festigkeit Bestanden GEF HRLICHE SUBSTANZEN NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050...

Page 53: ...ONORE 70 dB A R SISTANCE de la stabilit structurelle satisfaisant de la performance de relevage satisfaisant de la r sistance m canique satisfaisant SUBSTANCES DANGEREUSES NPD 0197 JUNG PUMPEN GmbH In...

Page 54: ...RUMOROSIT 70 dB A DUREVOLEZZA della stabilit strutturale Superata della capacit di sollevamento Superata della resistenza meccanica Superata SOSTANZE PERICOLOSE NPD 0197 JUNG PUMPEN GmbH Industriestr...

Page 55: ...hovuje Mechanick pevnosti vyhovuje NEBEZPE N SUBSTANCE NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050 1 2001 erpacie stanice odpadov ch v d s o...

Page 56: ...kai szil rds g tart ss ga Megfelelt VESZ LYES ANYAGOK NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050 1 2001 Sta ie de pompare ape uzate cu mate...

Page 57: ...tr 4 6 33803 Steinhagen Germany www jung pumpen de DE Wir erkl ren in alleiniger Verantwortung dass das Produkt den aufgef hrten Richtlinien entspricht CS Prohla ujeme na svou v lu nou odpov dnost e v...

Page 58: ...gef hrten Richtlinien entspricht CS Prohla ujeme na svou v lu nou odpov dnost e v robek odpov d jmenovan m sm rnic m DA Vi erkl rer under ansvar at produktet i overensstemmelse med de retningslinjer E...

Page 59: ...59...

Page 60: ...60...

Page 61: ...61...

Page 62: ...62...

Page 63: ...63...

Page 64: ...64...

Page 65: ...65...

Page 66: ...66...

Page 67: ...67...

Page 68: ...68...

Page 69: ...69...

Page 70: ...etrieb 6 min Pause Spieldauer 10 min Example for 40 4 min operation and 6 min rest Cycle duration 10 min Exemple 40 4 min de service et 6 min de pause Dur e du jeu 10 min Eksempel 40 4 min drift 6 min...