If the pump is malfunctioning, part of the contents of the oil 
reservoir could escape into the pumping medium.

Not Ex-pumps. 

If a hose is used as a pressure line, care must 

be taken to ensure that for every pumping operation the hose 
is completely empty before the pump is submersed. Any resid-
ual liquid would obstruct the ventilation of the pump housing 
and therefore also hinder the pumping operation.
This situation can also occur if the pump runs dry, pumps down 
to a lower lever than that shown in the installation drawing, or 
runs in "snore" mode during the daily test run.

SERVICING

Maintenance and inspection of this product must be carried 
out in accordance with EN 12056-4 and EN 60074-19. To ensure 
continued reliability of service, we recommend that you take 
out a service contract. 

WARNING!

Before carrying out any works: disconnect the pump and the 
controls from the mains and take steps to ensure that it cannot 
be emergized again.

WARNING!

Check the plug and the mains cable for signs of mechanical and 
chemical damage. Damaged or kinked cables must be replaced.

NOTICE!

 When using a chain to lift the pump, please observe 

the relevant national regulations regarding accident preventi-
on. Lifting gear must be checked regularly by an expert in ac-
cordance with the legal regulations.

NOTICE!

  Motors  in  the  EX  range  conform  to  the  "flameproof 

enclosures" ignition protection category. Maintenance works 
that affect the explosion protection may only be carried out by 
authorised specialists or by the manufacturer. When carrying 

out repairs, all areas next to flameproof gaps must be checked 

for damages and, if necessary, replaced genuine parts.

Oil check

The oil reservoir is sealed on the outside with a sealing screw 
"Öl" (oil). In order to check the mechanical seal, the oil, includ-
ing any residue, must be drained from the oil reservoir and col-
lected in a clean measuring container. 

   

If the oil is contaminated with water (milky), an oil change 

must be carried out. Check again after a further 300 operat-
ing hours, but at the very latest after 6 months! 

   

However, if the oil is contaminated with both water and pol-

lutants, then not only the oil must be replaced, but the me-
chanical seal as well. 

For monitoring the oil reservoir, it is also possible to retrofit 

the electrode of our "DKG" or DKG-Ex" seal leak control device 
in place of the "DKG" sealing screw. 

Changing the oil

To  ensure  operational  liability,  the  first  oil  change  should  be 

carried out after 300 operating hours, with further oil changes 
carried out after every 1000 operating hours.
If the number of operating hours is very low, an oil change 
should still be carried out at least once a year.
If wastewater with strongly abrasive constituents is being 

pumped, the oil changes should be carried out at correspond-
ingly shorter intervals.
Use HLP hydraulic mineral oil, viscosity class 22 to 46, e.g. Mo-
bil DTE 22, DTE 24, DTE 25, to replace the oil in the oil reservoir.
The volume of oil required is 520 cm³ for MultiCut 25/2 to 36/2, 
750 cm³ for MultiCut 45/2 and 2600 cm  for the MultiCut 75/2 
und 76/2.

NOTICE! 

The oil reservoir may only be filled with the specified 

quantity of oil. Overfilling will result in the pump being rendered 

inoperable.

Checking the pump unit 

The housing screws for the pump, and the connecting and fix

-

ing screws of the installation must be checked to ensure they 

are fixed securely. They should be tightened if necessary.

If the pump performance decreases, or if increasingly loud 
noises can be heard during operation, or if the cutting perfor-
mance decreases (the pump tends to become blocked), the 
impeller and cutting system must be checked for wear by an 
expert and replaced if necessary.

Replace the impeller

CAUTION!

Worn impellers can have sharp edges.
1.  Block the cutting rotor with a piece of wood and unscrew 

the central hexagon socket screw

2.  Unscrew the four hexagon socket screws on the top of the 

spiral housing, and take off the spiral housing. 

3.  Fit the new impeller with the feather key onto the shaft, 

using the same number of adjusting washers as before. 

4.  Measure dimension B on each blade and note the largest 

measurement. 

5.  Measure dimension A in several places and note the smal-

lest measurement.

 

6.   

Notice!

 The impeller gap A-B must measure 0,5-0,7 mm.  

If the gap is larger or smaller, use adjusting washers 
(12x16x0.2) under the impeller to adjust the gap.

7.  Screw the spiral housing and the oil reservoir/motor back 

together again. 

8. 

As a final step, put the cutting rotor back on and adjust the 

cutting gap.

Checking the cutting clearance

Using a suitable tool, e.g. feeler gauge, the cutting clearance 
between the cutting rotor and the cutting plate can be meas-
ured. A cutting clearance of over 0.2 mm must be reduced.

Summary of Contents for MULTICUT 25/2 ME

Page 1: ...ctions de service NL Gebruikshandleiding IT Istruzioni per l uso PL Instrukcja eksploatacji CZ N vod pro provoz SK N vod na prev dzku HU zemeltet si tmutat RO Manual de utilizare MULTICUT 25 2 ME 35 2...

Page 2: ...Sym bolen besonders gekennzeichnet NichtbeHinweis kann ge f hrlich werden Allgemeine Gefahr f r Personen Warnung vor elektrischer Spannung HINWEIS Gefahr f r Maschine und Funktion Personalqualifikatio...

Page 3: ...Kurzzeitbetrieb S2 s Techn Daten Motor aufgetaucht Aussetzbetrieb S3 s Techn Daten Bei Lagerung im Trockenen ist die Tauchpumpe bis 20 C frostsicher Eingebaut darf sie im Wasser jedoch nicht einfrie...

Page 4: ...getauscht werden VORSICHT Der Anlaufruck kann mit gro er Kraft erfolgen Potentialausgleich Nach EN 60079 14 und EN 1127 1 muss in explosionsgef hr deten Bereichen bei Betriebsmitteln mit Schutzleiter...

Page 5: ...lkammer ist durch eine Verschlussschraube nach au en abgedichtet Zur Kontrolle der Gleitringdichtung wird das l der lkammer einschlie lich der Restmenge abgelassen und in einem sauberen Messbecher au...

Page 6: ...erst Druckst ck und Schneidrotor entfernt wie oben be schrieben Dann werden die 4 Innensechskantschrauben her ausgedreht und das Spiralgeh use abgenommen Laufrad und Spiralgeh use k nnen jetzt gereini...

Page 7: ...g of electrical voltage NOTICE Danger to equipment and operation Qualification and training of personnel All personnel involved with the operation servicing inspection and installation of the equipmen...

Page 8: ...must not be allowed to freeze in the water Transport The pump must always be lifted by the handle and never by the power supply cable The pump should only be lowered by using a rope or chain ELECTRICA...

Page 9: ...al bonding must be installed for facilities with protec tive earth conductors in TN TT networks in areas subject to explosion hazards In Germany for example the design must be in accordance with VDE 0...

Page 10: ...etrofit the electrode of our DKG or DKG Ex seal leak control device in place of the DKG sealing screw Changing the oil To ensure operational liability the first oil change should be carried out after...

Page 11: ...and adjust the cutting clearance To clean the pump chamber a flushing pipe can be fitted as and when required To do so the Luft air sealing screw is remo ved and in its place the flushing pipe fitted...

Page 12: ...ion Le non respect des consignes de s curit peut entra ner la perte de tous les droits r paration du dommage Dans ces instructions de service les consignes de s curit sont identifi es de mani re parti...

Page 13: ...nt sur la s curit lors de la mise en ser vice d installations n cessitant un contr le et sur l organisation de la s curit et de la sant des travailleurs article 1 du d cret sur la s curit des exploita...

Page 14: ...ur les pompes protection antid flagration il faut en plus un d clencheur au type de construction contr l et qui tient compte des exigences de l examen EU de type Sens de rotation Neconcernepaslespompe...

Page 15: ...tec tion enveloppe antid flagrante Seuls les entreprises homo logu es ou le fabricant auront l autorisation d effectuer les travaux de remise en tat influen ant la protection antid flag rante Lors des...

Page 16: ...le il faut d abord retirer la plaque d appui et le rotor de coupe comme d crit ci dessus On d visse ensuite les 4 vis six pans creux et retire la volute en spirale Il est maintenant possible de proc d...

Page 17: ...aak op schadervergoeding vervallen In deze handleiding zijn de veiligheidsinstructie extra aange geven met symbolen Het niet opvolgen kan tot gevaarlijke si tuaties leiden Algemeen gevaar voor persone...

Page 18: ...al van 40 C Motor gedompeld Continugebruik S1 Motor uit het water gehaald Kort gebruik S2 zie Technische gegevens Motor uit het water gehaald Uitschakelgebruik S3 zie Techni sche gegevens Wanneer opge...

Page 19: ...randaarde in het TN TT netwerk een aanvullende potentiaalvereffening worden ge nstalleerd Ontwerpspecificatie in Duitsland bijvoorbeeld con form VDE 0100 deel 540 Voor beton en plastic schachten van P...

Page 20: ...d Ter controle van de oliekeerringafdichting wordt de olie uit de oliekamer met inbegrip van de resterende hoe veelheid afgetapt en verzameld in een schone maatbeker Als de olie doordrenkt is met wate...

Page 21: ...rboven beschreven Vervolgens worden de 4 inbusschroeven eruit ge draaid en het slakkenhuis eraf gehaald Waaier en slakkenhuis kunnen nu worden gereinigd Daarna worden de afzonderlijke delen gemonteerd...

Page 22: ...curezza sono contrassegnate con determinati simboli L inosservanza pu essere pericolosa Pericolo generico per le persone Pericolo tensione elettrica Avviso Pericolo per macchinari e funzionamento Qual...

Page 23: ...o S1 Motore emerso funzionamento per breve tempo S2 ved specifiche tecniche Motore emerso funzionamento intermittente S3 ved speci fiche tecniche In caso di deposito all asciutto la pompa sommersa sic...

Page 24: ...u verificarsi con maggiore forza Collegamento equipotenziale Secondo la EN 60079 14 e EN 1127 1 nelle aree a pericolo di esplosione in cui sono presenti mezzi di produzione con cavi di protezione nell...

Page 25: ...cambio dell olio Dopo altre 300 ore di funzionamento ma max dopo 6 mesi controllare nuovamente Se nell olio presente troppa acqua e materiali inquinanti necessario sostituire l olio e la tenuta mecca...

Page 26: ...La girante e l alloggiamento a spirale possono ora essere puliti Quindi rimontare le singole parti e impostare il gioco di taglio Per la pulizia del pozzo di pompaggio possibile installare in seguito...

Page 27: ...trukcje bezpiecze stwa znako wane s w spos b szczeg lny Ich ignorowanie mo e powodo wa wyst pienie zagro enia Og lne zagro enie dla os b Ostrze enie przed napi ciem elek trycznym Notyfikacja Zagro eni...

Page 28: ...nurzony Praca przerywana S3 patrz dane technicz ne Przy magazynowaniu w warunkach suchych pompa jest odporna na mr z do 20 C Jednak zanurzona mo e w wodzie zamarzn Transport Pompa powinna by podnoszon...

Page 29: ...e np w Niemczech wed ug VDE 0100 cz 540 Dla studzienek betonowych i plastikowych firmy Pentair Jung Pumpen w strefie wybuchowej 1 oraz 2 dodatkowe lokalne system wyr wnania potencja u nie jest koniecz...

Page 30: ...omory olejowej mo na zamontowa dodatkowo elektrod naszego urz dzenia s u cego do kon troli szczelno ci DKG lub DKG Ex i wkr ci j w miejsce rubki za lepiaj cej z napisem DKG Wymiana oleju Celem utrzyma...

Page 31: ...powej mo na dodatkowo zainstalowa rur p ucz c W tym celu nale y wykr ci rub zamykaj c Luft Powietrze i na jej miejsce zamontowa rur p ucz c NOTYFIKACJA Przy odkr ceniu niew a ciwych rub dojdzie do wyc...

Page 32: ...pe pro stroje a funkce Kvalifikace person lu Person l pro obsluhu dr bu kontrolu a mont mus m t od pov daj c kvalifikaci pro tyto pr ce a b t dostate n informo v n na z klad studia N vodu pro provoz O...

Page 33: ...ny po adavky potvrzen o zkou ce konstruk n ho modelu EU OZN MEN Elektrick pr ce na erpadle nebo zen sm prov d t jen kvalifikovan elektrik Musej b t dodr eny p slu n platn normy nap EN speci ln vnitro...

Page 34: ...esem erpadla erpadel Z d vod ochrany proti korozi by m la b t pro vytvo en spojen pou ita nerezov ocel erpadla chr n n proti explozi jsou pro toto opat ena mo nost p ipojen na kabelov veden MONT P i i...

Page 35: ...je v dy po 1000 hodin ch provozu P i ni m po tu hodin provozu v ak prov st v m nu oleje nej m n jednou za rok Jestli e je p epravov na odpadn voda se siln abrazivn mi p m semi je nutn po tat s v m nou...

Page 36: ...elem vy i t n stanice erpadla je mo n tak dodate n instalovat vyplachovac trubku Za t m elem odstranit uzav rac roub Luft vzduch a na erpadle namontovat vyplacho vac trubku Ozn men P i povolen nespr...

Page 37: ...zpe n V eobecn nebezpe enstvo pre osoby V straha pred elektrick m nap t m Ozn menie Nebezpe enstvo ohrozenia stroja a jeho funkcie Kvalifik cia person lu Person l vykon vaj ci obsluhu dr bu rev zie a...

Page 38: ...dorn do 20 C Nain talovan erpadlo v ak nesmie vo vode zamrzn Preprava erpadlo sa m dv ha z sadne prostredn ctvom r ky a nie pr vodn m k blom Sp anie erpadla do hlb ch cht alebo j m vykon vajte len za...

Page 39: ...dato n miestne vyrovnanie potenci lu vyjadrenie T V Nord 03 2008 V nimka Ke vodiv diely napr ochrana k bla z vlnit ho kom penz tora alebo kovov v tla n r ra ved na pripojen achty V takomto pr pade mus...

Page 40: ...ja po ka d ch 1000 prev dzkov ch hodin ch Pri men om po te prev dzkov ch hod n je v ak potrebn olej vymie a minim lne jedenkr t za rok Ak sa erp odpadov voda so silne abraz vnymi pr mesami je potrebn...

Page 41: ...adl mo no aj dodato ne nai talova vyplachovaciu r rku K tomu sa odstr ni uzatv racia skrutka Luft vzduch a na erpadle sa namontuje vyplachovacia r rka Ozn menie Pri uvo nen nespr vnych skrutiek vyte i...

Page 42: ...az zemeltet si tmutat ban a k l nb z t pus biz tons gi utas t sokat az al bbi szimb lumokkal emelt k ki Ezen utas t sok be nem tart sa vesz lyes ltal nos szem lyi s r l s vesz ly Vesz lyes fesz lts g...

Page 43: ...efagyjon a v zbe Sz ll t s A pumpa alapvet en a foganty n l s nem a bevezet vezet k n l emelend M ly akn ba vagy rokba a szivatty t csak k t l vagy l nc seg ts g vel szabad leengedni VILLAMOSCSATLAKOZ...

Page 44: ...m anyag nyom cs k v lr l az akna csatlakoztat s hoz vezetnek Ebben az esetben elektromos vezet kapcso latot kell kialak tani a pumpa pump k foglalat val A csat lakoz s l trehoz s hoz korr zi v delmi...

Page 45: ...n rz k sz l k nk elektr d ja a DKG dug csavar hely re Olajcsere A m k d sbiztons g fenntart sa rdek ben le kell cser lni az olajat el sz r 300 zem ra ut n majd 1000 zem r nk nt Enn l kisebb zem rasz m...

Page 46: ...nnak hely re szerelje fel a mos cs vet a pump ra RTES T S Rossz csavarok kicsavar sa eset n kifolyik az olaj az olajkamr b l MA megh z si nyomat kok A2 szerkezeti anyag csavarokn l M 6 eset ben MA 8 N...

Page 47: ...ubire n cadrul acestui manual de utilizare instruc iunile de siguran sunt marcate n mod special prin simboluri Nerespectarea lor poate fi periculoas Pericol general pentru persoane Aten ionare pentru...

Page 48: ...40 C motor scufundat func ionare continu S1 motor aflat la suprafa func ionare pe termen scurt S2 vezi Date tehnice motor aflat la suprafa func ionare intermitent S3 vezi Date tehnice La depozitarea p...

Page 49: ...lului de alimentare PRECAU IE Impulsul de pornire poate fi foarte puternic Egalizare de poten ial Conform EN 60079 14 i EN 1127 1 n zonele cu pericol de ex plozie trebuie instalat un egalizator de pot...

Page 50: ...lei Dup alte 300 ore de func ionare maxim ns dup 6 luni trebuie efectuat o noua verificare Dac la ulei s a infiltrat ap i impurit i pe l ng ulei tre buie nlocuit i garnitura de etan are cu inel de alu...

Page 51: ...cum cur ate Dup aceea se monteaz din nou p r ile componente i se regleaz distan a de t iere Pentru cur area pu ului pompei se poate instala i ulterior un tub de cl tire n acest scop se ndep rteaz urub...

Page 52: ...Bestanden der Hebewirkung Bestanden der mechanischen Festigkeit Bestanden GEF HRLICHE SUBSTANZEN NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050...

Page 53: ...ONORE 70 dB A R SISTANCE de la stabilit structurelle satisfaisant de la performance de relevage satisfaisant de la r sistance m canique satisfaisant SUBSTANCES DANGEREUSES NPD 0197 JUNG PUMPEN GmbH In...

Page 54: ...RUMOROSIT 70 dB A DUREVOLEZZA della stabilit strutturale Superata della capacit di sollevamento Superata della resistenza meccanica Superata SOSTANZE PERICOLOSE NPD 0197 JUNG PUMPEN GmbH Industriestr...

Page 55: ...hovuje Mechanick pevnosti vyhovuje NEBEZPE N SUBSTANCE NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050 1 2001 erpacie stanice odpadov ch v d s o...

Page 56: ...kai szil rds g tart ss ga Megfelelt VESZ LYES ANYAGOK NPD 0197 JUNG PUMPEN GmbH Industriestr 4 6 33803 Steinhagen Germany 13 411 13 1612 412 13 1612 EN 12050 1 2001 Sta ie de pompare ape uzate cu mate...

Page 57: ...tr 4 6 33803 Steinhagen Germany www jung pumpen de DE Wir erkl ren in alleiniger Verantwortung dass das Produkt den aufgef hrten Richtlinien entspricht CS Prohla ujeme na svou v lu nou odpov dnost e v...

Page 58: ...gef hrten Richtlinien entspricht CS Prohla ujeme na svou v lu nou odpov dnost e v robek odpov d jmenovan m sm rnic m DA Vi erkl rer under ansvar at produktet i overensstemmelse med de retningslinjer E...

Page 59: ...59...

Page 60: ...60...

Page 61: ...61...

Page 62: ...62...

Page 63: ...63...

Page 64: ...64...

Page 65: ...65...

Page 66: ...66...

Page 67: ...67...

Page 68: ...68...

Page 69: ...69...

Page 70: ...etrieb 6 min Pause Spieldauer 10 min Example for 40 4 min operation and 6 min rest Cycle duration 10 min Exemple 40 4 min de service et 6 min de pause Dur e du jeu 10 min Eksempel 40 4 min drift 6 min...

Page 71: ...a realizowane s przy stosowaniu po cze zaci skowych X mi dzy z czem wtykowym Coni y i silnikiem Nowe po czenie zaciskowe nale y wykona fachowo Zm ny sp n n je t eba prov d t za pou it stla iteln ch sp...

Page 72: ...no Pisa 41 200 Sosnowiec Deutschland Italia Polska Tel 49 5204 170 Tel 39 050 716 111 Tel 48 32 295 1200 kd jung pumpen de info jung pumpen it infopl jungpumpen pentair com PENTAIR and PENTAIR JUNG PU...

Reviews: