12
E-03-577 (01-23-20)
3 PHASE
Notes:
1. Level Switches Must be Rated a Minimum of 2 Amps at 120 Volts
2. Torque all white field wiring terminals to 20 in. Lbs.
3. Field Wiring Must be 60˚C Copper Wire Minimum.
4. -------------- = Items Note Supplied In Control Panel.
5. Pump power, heat sensor, and seal probe cables must pass
through approved NEC 501.15 conduit seals.
1 PHASE
BLACK, WHITE, AND RED MOTOR LEADS CAN ONLY BE
CONNECTED TO PANEL TERMINAL BLOCKS AS SHOWN ON
SCHEMATIC. INCORRECT CONNECTION CAN CAUSE DAMAGE TO
PUMP AND/OR PANEL COMPONENTS THREE PHASE OVERLOAD
RELAY MUST BE CLASS 1O TRIP & AMBIENT COMPENSATED &
CONNECTED IN THE “DAISY CHAIN” CIRCUIT AS SHOWN.
Notes:
1. Level Switches Must be Rated a Minimum of 2 Amps at 120 Volts
2. Torque all white field wiring terminals to 20 in. Lbs.
3. Field Wiring Must be 60˚C Copper Wire Minimum.
4. -------------- = Items Note Supplied In Control Panel.
5. Pump power, heat sensor, and seal probe cables must pass
through approved NEC 501.15 conduit seals.
WIRING DIAGRAMS
Summary of Contents for C4S(X)P Series
Page 14: ...14 E 03 577 01 23 20 NOTES...
Page 15: ...15 E 03 577 01 23 20 NOTES...