MAINTENANCE INSTRUCTIONS
66
Primary heat exchanger
(see fig. 1)
•
Close the shut-off valves and drain the
central heating circuit of the boiler;
•
Switch off the power and gas supply to the
boiler;
•
Remove and dismantle the entire burner
unit
(see “Cleaning the condensation module
and burner
unit”);
•
Remove the gas valve;
•
Remove the spring and then the
condensate drainpipe;
•
Remove the fixing springs and then the
delivery and return pipes;
•
Remove the support brackets and pull out
the heat exchanger;
•
Remove the regulation sensor from the old
heat exchanger and refit it together with the
two condensate drainpipes to the new one;
•
Replace the heat exchanger and re-
assemble the components following the
above procedure in reverse order;
•
Switch on the electricity, water and gas
supplies and fill the system with water.
Check for any leaks from the joints and
bleed off any air from the circuit. Restart the
boiler, making sure that there are no gas
leaks;
Fig. 1
stainless steel
pipe coil
ceramic fiber
washer
flue connection
chamber
primary heat
exchanger
Summary of Contents for PCH 50B-H
Page 8: ...GENERALINFORMATION 5 ...
Page 9: ...GENERALINFORMATION 6 ING ...
Page 10: ...GENERALINFORMATION 7 ...
Page 11: ...GENERALINFORMATION 8 ...
Page 14: ...TECHNICALCHARACTERISTCS 11 2 2 Dimensions ...
Page 35: ...INSTALLATION INSTRUCTION 32 Venting Pictures Illustrations ...
Page 36: ...INSTALLATION INSTRUCTION 33 Part No PAHVK Horizontal Vent Kit ...
Page 40: ...INSTALLATION INSTRUCTION 37 ...
Page 75: ...73 6 12 Sequence of operations ...
Page 76: ...74 ...
Page 77: ...75 ...
Page 78: ...76 ...
Page 79: ...77 ...