Hardware Installation
- 28 -
Relion 2908GT Chassis Manual
1
Installing Add-on Card (MNXE2/MEZZ_2/Optional)
•
Voltages can be present within the server whenever an AC power source is connected. This
voltage is present even when the main power switch is in the off position. Ensure that the system
is powered-down and all power sources have been disconnected from the server prior to installing
a PCI card.
Failure to observe these warnings could result in personal injury or damage to equipment.
Follow these instructions to install Add-on card:
1.
Remove the rear bracket.
2.
Secure the stand-off on the motherboard with screws.
3.
Attach the interposer card to the add-on card.
4.
Insert the add-on card into the selected slot (MEZZ_2)and secure the card with screws. Make sure
that the card is properly seated.
5.
Secure the add-on card in place with screws.
5
3
4
2
1
Summary of Contents for Relion 2908GT
Page 14: ...Hardware Installation 14 Relion 2908GT Chassis Manual 1 3 System Block Diagram...
Page 26: ...Hardware Installation 26 Relion 2908GT Chassis Manual 2 1 3 4...
Page 30: ...Hardware Installation 30 Relion 2908GT Chassis Manual 3 7 5 6 4...
Page 33: ...Hardware Installation 33 Relion 2908GT Chassis Manual 3 Airflow direction...
Page 55: ...55 BIOS Setup Relion 2908GT Chassis Manual 5 2 1 Serial Port Console Redirection...
Page 56: ...BIOS Setup 56 Relion 2908GT Chassis Manual...
Page 70: ...BIOS Setup 70 Relion 2908GT Chassis Manual 5 9 SIO Configuration...
Page 75: ...75 BIOS Setup Relion 2908GT Chassis Manual 5 3 1 Processor Configuration...
Page 78: ...BIOS Setup 78 Relion 2908GT Chassis Manual 5 3 1 1 Pre Socket Configuration...
Page 85: ...85 BIOS Setup Relion 2908GT Chassis Manual 5 3 4 QPI Configuration...
Page 89: ...89 BIOS Setup Relion 2908GT Chassis Manual 5 3 5 1 Memory Topology...
Page 98: ...BIOS Setup 98 Relion 2908GT Chassis Manual 5 3 7 2 PCH sSATA Configuration...
Page 103: ...BIOS Setup 103 Relion 2908GT Chassis Manual 5 3 7 3 PCH SATA Configuration...