PV 100a
Operation
The burner is controlled via user interface on the front panel. LCD screen (1) displays settings menu,
event log etc. Yellow light (2) shows the presence of flame in burning chamber. Or if blinking, the
burner is out of normal operation. Status can be seen on log screen.
Green light (3) indicates if there
is fuel in the burner. To move in menus, use up and down buttons, to change parameter, press OK, to
go back to LOG press “ESC” button.
Figure 9 Front panel
1 – diplay
2 – yellow led, showing the flame in the burner
3 – green led, showing the fuel in the burner
4 – Plug for auger connection
5 – Plug for boiler connection
Starting
Prior to the initial start-up of the burner make sure that:
•
The burner is connected to the boiler
•
The boiler thermostat is installed and is functioning properly
•
The boiler thermostat is turned to lowest temperature
•
The external auger is installed and connected to the burner