12
VENTING & AIR INLET PIPING
D. EXHAUST VENT/AIR INTAKE PIPE SIZING
1. PureFire boiler model PFW-199 and PF-210 are to be
installed using 3” Schedule 40 or 80 PVC or CPVC
piping using the provided vent adapter. PureFire boiler
model PFW-399 is to be installed using Schedule 40 or
80 PVC or CPVC using the vent adapter provided.
2. Polypropylene vent systems may be installed using
optional InnoFlue
®
or PolyPro
®
vent adapters. Table
3.2 shows the appropriate PB Heat stock codes.
Contact your PB Heat Representative for more
information on this option.
3. Combined systems using separate polypropylene
exhaust & air inlet pipes which transition to concentric
can also be installed. Contact your Centrotherm or
DuraVent representative for more information.
4. The total combined length of exhaust vent and air
intake piping is 200 equivalent feet (60 m).
a. The equivalent length of elbows, tees and other
fittings are listed in Table 3.3.
b. The equivalent length can be calculated as follows.
This is well below the 200 feet maximum
equivalent length. If the total is above 200
equivalent feet, alternate boiler locations or
exhaust penetration location should be considered.
Figure 3.9: Concentric Vertical Vent Installation
Figure 3.10: Venting Through A Chimney Using
Outdoor Air
Fitting Description
Equivalent Length
Elbow, 90° Short Radius
5 feet
Elbow, 90° Long Radius
4 feet
Elbow, 45° Short Radius
3 feet
Coupling
0 feet
Air Intake Tee
0 feet
Stainless Steel Vent Kit
1 foot
Concentric Vent Kit
3 feet
Table 3.3: Equivalent Length of Fittings
Exhaust
Air Inlet
Total
Straight Length of Pipe
50'
50'
100'
90° Elbows, SR
2 x 5'= 10'
1 x 5' = 5'
15'
45° Elbows, SR
2 x 3' = 6'
6'
Conc. Vent Termination
1 x 3' = 3'
3'
Total
124'
Table 3.4: Sample Equivalent Length Calculation
Table 3.2: Polypropylene Vent Adapters
Boiler
Model
Centrotherm
InnoFlue
®
DuraVent
PolyPro
®
PFW-199
54632
54630
PFW-210
54632
54630
PFW-399
54633
54631
Summary of Contents for PUREFIRE PFW-199
Page 20: ...18 WATER PIPING AND CONTROLS Figure 4 3 Schematic Piping One Boiler with a Single Storage Tank...
Page 60: ...58 Figure 13 2 Heat Exchanger Burner Assembly Repair Parts REPAIR PARTS...
Page 63: ...61 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS...
Page 64: ...62 APPENDIX A STATUS SCREENS...
Page 65: ...63 APPENDIX A STATUS SCREENS...
Page 66: ...64 APPENDIX B USER MENU APPENDIX B USER MENU...
Page 67: ...65 APPENDIX B USER MENU...
Page 68: ...66 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU...
Page 69: ...67 APPENDIX C INSTALLER MENU...
Page 70: ...68 APPENDIX C INSTALLER MENU...
Page 71: ...69 APPENDIX C INSTALLER MENU...