7
BOILER SET-UP
A. GENERAL
1.
P
ure
F
ire
®
boilers are intended for installation in an
area with a floor drain or in a suitable drain pan.
Do not install any boiler where leaks or relief valve
discharge will cause property damage.
2. The
P
ure
F
ire
®
boiler is not intended to support
external piping. All venting and other piping should
be supported independently of the boiler.
3. Many jacket panels on the
P
ure
F
ire
®
boiler are
removable to allow inspection and maintenance. Do
not attached fixed brackets for piping or wiring on
removable jacket parts. Piping and/or wiring should
not obstruct access to removable panels.
4. Install the boiler level to prevent condensate from
backing up inside the boiler.
5. Use leveling feet to assure that the boiler is completely
level. This will prevent condensate from collecting
in the boiler and causing degradation of the heat
exchanger.
B. STACKING MULTIPLE BOILERS
Identical PFC-850, PFC-1000 or PFC-1500 boilers can
be stacked to save floor space on the installation. Figure
2.1 shows how the upper boiler is to be attached to the
lower boiler.
1. Remove all side jacket panels from the both boilers
and the top jacket panels from the lower boiler.
2. Remove the leveling legs from the boiler to be
installed on top.
3. Lift the upper boiler into place by passing 5 to 10 foot
(2-3 meter) lengths of 1” to 1-1/4” Schedule 40 or 80
steel pipe through the holes provided in the boiler frame.
4. Insert spacers, washers and bolts (provided) through
the holes provided in the frame of the lower boiler
and thread them into the threaded inserts on the base
of the upper boiler. Figure 2.1 shows this assembly.
Tighten the bolts securely.
5. Replace all the side jacket panels and discard the top
jacket panels from the lower boiler.
2. BOILER SET-UP
Figure 2.1: Stacking and Securing Boilers
This boiler must be installed level to prevent
condensate from backing up inside the boiler.
CAUTION
Do not lift these boilers by hand. Failure to comply
may result in serious injury, death or major property
damage.
WARNING
Figure 2.2: Lifting the Upper Boiler
CRANE LIFT ONLY
FORKLIFT OR
BY HAND
DO NOT LIFT
Summary of Contents for PUREFIRE PFC-1000
Page 1: ...PUREFIRE Boilers PFC 850 PFC 1000 PFC 1500 Gas Installation Operation Maintenance Manual ...
Page 82: ...80 Figure 13 4 Control System REPAIR PARTS ...
Page 84: ...82 Figure 13 5 Condensate System REPAIR PARTS ...
Page 90: ...88 APPENDIX C USER MENU APPENDIX C USER MENU Figure C 1 User Menu Managing Burner ...
Page 91: ...89 APPENDIX C USER MENU Figure C 1 User Menu Dependent Burner ...
Page 92: ...90 APPENDIX D INSTALLER MENU STRUCTURE APPENDIX D INSTALLER MENU STRUCTURE ...
Page 93: ...91 APPENDIX D INSTALLER MENU STRUCTURE ...
Page 95: ...93 SERVICE LOG SERVICE LOG Date Serviced By Description of Service Serial Number ...
Page 96: ...94 NOTES ...
Page 97: ...95 NOTES ...