
20
Threaded
Boss
Blower
Cone Tab
Blower
Cone
Boot Kit Installation
Secure the Boot Plate (Item #2) to the Aluminum Boot (Item #1) using (2) 3/8”-16 x 1” Carriage Bolts (Item #3) and (2)
3/8”-16 Nylon Flange Locknuts (Item #4). Insert the bolts from the inside so that the threads are on top of the boot.
This will prevent grass clippings from collecting on the bolt threads. Leave the hardware loose until the boot assembly
has been attached to the mower deck. Refer to Figure A below.
Figure B
Figure D
Figure A
Blower Cone Installation
Thread (1) 5/16”-18 Jam Nut P#(K0120) onto each end
of (2) 5/16”-18 x 2-1/2” HHCS P#(K0125) as shown in
Figure A.
Now partially thread (1) bolt into each of the two
threaded bosses located on the Blower Housing. Place
8” Blower Cone P#(E6009) so the two tabs line up with
the bolts and tighten completely as shown in Figure B.
Thread (1) Jam Nut
Onto Each 5/16”-18 Bolt
Figure A
Once the (2) bolts are tight, tighten the Jam Nuts against
the threaded boss as shown in Figure C.
Refer to Figure D for proper Blower Cone installation
reference.
(1st) Tighten
Bolt
(2nd) Tighten
Jam Nut
Figure C
Summary of Contents for 54131501
Page 27: ...27 A2184 Mount Arm Assy Exploded Parts View...
Page 29: ...29 A2058 Gearbox Sub Assembly Exploded Parts View...
Page 31: ...31 4 3 1 2 A2057_01 Drive Assembly Exploded Parts View...
Page 32: ...32 A2060_01 Mounted Drive Assembly Exploded Parts View...
Page 33: ...33 A2039_02 Base Drive Assembly Exploded Parts View...
Page 34: ...34 A2039_02 Base Drive Assembly Exploded Parts List...
Page 35: ...35 A2061_02 Drive Assembly 4 Blade Impeller Exploded Parts View...
Page 36: ...36 A2061_02 Drive Assembly 4 Blade Impeller Exploded Parts List...
Page 37: ...37 A1158 Top Assembly w PECO Logo Exploded Parts View...
Page 38: ...38 A1157 Top Assembly Exploded Parts View...
Page 39: ...39 A2223 Top Assembly Exploded Parts View...
Page 40: ...40...
Page 44: ...44...