![Peak Pilates MVe Reformer Mat Set Assembly & User'S Manual Download Page 7](http://html1.mh-extra.com/html/peak-pilates/mve-reformer-mat-set/mve-reformer-mat-set_assembly-and-users-manual_1517337007.webp)
7
Check to see whether the unit you have includes the
1.
mounting brackets for the MVe Tower. If so, proceed
from step 2 below. If not, skip to the section titled:
“MVe Tower Retrofit Procedures”.
Tools required: 5mm Allen Wrench and pliers or
2.
13mm open end wrench.
Using (4) 8mm x 80mm long Button Head Cap
Screws, (2) 8mm x 50mm long Button Head Cap
Screws, (10) 8mm washers and (4) 8mm nuts,
assemble the (2) Lower Tower Connecting Tubes to
the Head End Leg as shown. Do not fully tighten the
fasteners at this point.
Tools required: Same as Step 2.
3.
Using (4) 8mm x 80mm long Button Head Cap
Screws, (2) 8mm x 30mm long Button Head Cap
Screws, (10) 8mm washers and (4) 8mm nuts,
assemble the 2 Upper Tower Connecting Tubes to
the brackets located under the Head End Cross
Member as shown. Do not fully tighten the fasteners
at this point.
With the help of an assistant, lift the Tower and
4.
place such that the Tower Mounting Plate butts
against the exposed ends of the Connecting Tubes.
The side of the Tower with five eyebolts faces
towards the center of the unit.
Tools required: 5mm Allen Wrench
5.
Using (8) 8mm x 30mm long Button Head Cap
Screws and (8) 8mm washers, fasten the Mounting
Plate to the ends of the Connecting Tubes.
Fully tighten all fasteners.
6.
If you have not already done so, fully retract each of
7.
the Pull Pins and completely withdraw the original
Risers.
STEP 1
STEP 2
STEP 3
STEPS 4 & 5
Assembly
MVe_Tower_Owners_Manual-10_09.indd 7
12/4/09 4:21:21 PM