Peak Pilates MVe Reformer Mat Set Assembly & User'S Manual Download Page 12

12

Tools required: 5mm Allen Wrench 

d. 

 
The Head End Cross Member is assembled 
using three screws on each of its Mounting 
Flanges. Locate all 6 screws. The screws identi-
fied as ‘A’ in the accompanying illustration 
need to be completely removed. The screws 
marked as ‘B’ only need to be loosened. 

Slide the Cross Member out of the aluminum 

e. 

Rails. 

Noting the orientation, slide the new Cross  

f. 

Member in making sure that the slots in the  
Cross Member Flange engage both of the  
mounting screws remaining on each side. 

Replace the third screw on each side. Fully 

g. 

tighten all screws. 

Tighten all 8 screws used to assemble the Head 

h. 

End Leg to the Rails (previously left loose per 
step 4c). 

Slide the plastic end cap back over the rails 

i. 

making sure that the wood is properly seated. 
If the tabs located on the top of the left and 
right corners of the plastic get caught on the 
Cross Member or Rail, pry up with a screwdriver 
and slide the end cap in until the wood is fully 
seated. 

Replace the three screws used to fasten the 

j. 

End Cap to the frame. Start all three screws 
then go back and tighten (see Step 5). 

Using a 17mm Open End Wrench or Pliers on 

k. 

the flats, hold the Shaft for the Lift Handle (see 
photo 7a) while replacing the assembly screws. 
Start both screws and then fully tighten using 
the 6mm Allen Wrench. Verify that the Handle 
slides in and out without binding. 

Continue from Step 2 of the MVe Tower Assembly 

8. 

Instructions above.

STEP 7d

A

B

MVe

®

 Tower Retrofit Procedures (continued)

MVe_Tower_Owners_Manual-10_09.indd   12

12/4/09   4:21:28 PM

Summary of Contents for MVe Reformer Mat Set

Page 1: ...MVe Reformer Tower Conversion Kit MVe Reformer Tower Retrofit Kit MVe Reformer Mat Set MVe_Tower_Owners_Manual 10_09 indd 1 12 4 09 4 21 16 PM...

Page 2: ...truct all individuals whether they are end users or supervising personnel on the proper use of the equipment Inspect the machine including all structural and mechanical components hardware springs and...

Page 3: ...ndicated below This product carries a two year limited warranty on the Tower structural components All other components with the exception of the upholstery straps and loops are covered by a one year...

Page 4: ...Clips Qty 2 4 Roll Down Bar 5 Safety Chain w 2 Safety Links 6 Foot Loops 7 Push Through Bar Storage Strap 8 Push Through Bar Spring w Quick Snap Clip and Safety Link 9 Push Through Bar Sleeve 10 Leg S...

Page 5: ...x 30mm long Button Head Cap Screw Qty 2 D 8mm Hex Nut Qty 8 E 8mm Washer Qty 20 A Foot End Mat B Head End Mat Tower Mounting Hardware Pack A 8mm x 30mm long Button Head Cap Screw Qty 8 B 8mm Washer Q...

Page 6: ...ombination Tool 2 Phillips Screwdriver 13mm Wrench 17mm Wrench 2 6mm Allen Wrench Note Only used for retrofit 3 5mm Allen Wrench 1 2 1 2 3 Retrofit Kit Additional Components Tools Included MVe_Tower_O...

Page 7: ...s 10 8mm washers and 4 8mm nuts assemble the 2 Upper Tower Connecting Tubes to the brackets located under the Head End Cross Member as shown Do not fully tighten the fasteners at this point With the h...

Page 8: ...lip to each end of each Spring Subse quently clip a Foot Loop to one of the double ended clips as shown Arm Springs The Arm Springs are the smallest b in diameter and are attached to the Roll Down Bar...

Page 9: ...ne end and a Quick i Snap Clip with Thumb Screw to the oppo site end of the PTB Spring The PTB Spring can be stored as shown in ii the accompanying photo The Safety Chain is stored by hooking one iii...

Page 10: ...mer on 3 its side and allow it to come to rest against the Foot Bar Removing Replacing the Head End Leg 4 Tool Required 5mm Allen Wrench a While the assistant continues to hold the unit using a 5 mm A...

Page 11: ...n Wrench Removing Replacing the Head End Cross Member Using a 17mm Open End Wrench or Pliers to a hold the flats of the Shaft loosen and remove both of the assembly screws for the Telescoping Lift Han...

Page 12: ...step 4c Slide the plastic end cap back over the rails i making sure that the wood is properly seated If the tabs located on the top of the left and right corners of the plastic get caught on the Cross...

Page 13: ...fully engaged before beginning any exercises Converting to Mat with or without Tower The Mat Set includes two mats one for the head end of the machine and one for the foot end The Foot End Mat is iden...

Page 14: ...1 Fold the Foot Bar so it rests on the Gear Block b Positioning Plate and the Gear Bar Support Bar so its hooks rest on the Foot Bar as shown Flip the Pulleys into the storage position the c pulleys...

Page 15: ...Bar as shown same position as is used for stacking Follow Steps 3 c d and e c No Rev units oblong Gear Bar without Tower 6 Place the Gear Bar in position 3 see 5 a g Fold the Foot Bar down on to the...

Page 16: ...iage Stop located on the underside of the Foot End Mat Place the Head End Mat onto the rails butted 9 against the Foot End Mat You may have to slightly compress the foam between the Head and Foot End...

Page 17: ...performance of the springs Tracking System The shielded bearings in the Carriage Wheels are permanently lubricated and require no further service You should inspect the Axles every two months Remove...

Page 18: ...py water solution and dry thoroughly with a soft cloth Replace Springs All Springs must be replaced each year Any spring that exhibits early signs of fatigue for example separation in coils needs to b...

Page 19: ...Information Peak Pilates 5555 Central Avenue Suite 200 Boulder Colorado 80301 303 998 1531 Worldwide 1 800 925 3674 North America 1 303 473 9142 Fax MVe_Tower_Owners_Manual 10_09 indd 19 12 4 09 4 21...

Reviews: