![Peak Pilates MVe Reformer Mat Set Assembly & User'S Manual Download Page 12](http://html1.mh-extra.com/html/peak-pilates/mve-reformer-mat-set/mve-reformer-mat-set_assembly-and-users-manual_1517337012.webp)
12
Tools required: 5mm Allen Wrench
d.
The Head End Cross Member is assembled
using three screws on each of its Mounting
Flanges. Locate all 6 screws. The screws identi-
fied as ‘A’ in the accompanying illustration
need to be completely removed. The screws
marked as ‘B’ only need to be loosened.
Slide the Cross Member out of the aluminum
e.
Rails.
Noting the orientation, slide the new Cross
f.
Member in making sure that the slots in the
Cross Member Flange engage both of the
mounting screws remaining on each side.
Replace the third screw on each side. Fully
g.
tighten all screws.
Tighten all 8 screws used to assemble the Head
h.
End Leg to the Rails (previously left loose per
step 4c).
Slide the plastic end cap back over the rails
i.
making sure that the wood is properly seated.
If the tabs located on the top of the left and
right corners of the plastic get caught on the
Cross Member or Rail, pry up with a screwdriver
and slide the end cap in until the wood is fully
seated.
Replace the three screws used to fasten the
j.
End Cap to the frame. Start all three screws
then go back and tighten (see Step 5).
Using a 17mm Open End Wrench or Pliers on
k.
the flats, hold the Shaft for the Lift Handle (see
photo 7a) while replacing the assembly screws.
Start both screws and then fully tighten using
the 6mm Allen Wrench. Verify that the Handle
slides in and out without binding.
Continue from Step 2 of the MVe Tower Assembly
8.
Instructions above.
STEP 7d
A
B
MVe
®
Tower Retrofit Procedures (continued)
MVe_Tower_Owners_Manual-10_09.indd 12
12/4/09 4:21:28 PM