![Peak Pilates MVe Reformer Mat Set Assembly & User'S Manual Download Page 10](http://html1.mh-extra.com/html/peak-pilates/mve-reformer-mat-set/mve-reformer-mat-set_assembly-and-users-manual_1517337010.webp)
10
Remove the ropes from the MVe Reformer and place
1.
on the side. Withdraw the Pull Pin for the Risers and
completely remove the Riser/Pulley Assembly from
the machine. Note: The old Risers will no longer be
used.
Place the Gear Bar and Gear Block (older units do
2.
not have a separate Gear Block) in Position (-1) and
the Foot Bar in its highest location. Make sure that
at least the center spring is attached.
With the help of an assistant, tip the Reformer on
3.
its side and allow it to come to rest against the Foot
Bar.
Removing/Replacing the Head End Leg:
4.
Tool Required: 5mm Allen Wrench
a.
While the assistant continues to hold the unit,
using a 5 mm Allen Wrench, unscrew and
remove all 8 screws securing the Leg to the
Frame.
Using the original screws, replace the old with
b.
the new Leg with welded Brackets. The Leg
is symmetric so does not need to be specifi-
cally oriented. Note that the new Leg no longer
requires the Stacking Bumpers.
Snug but do not fully tighten the 8 screws.
c.
STEP 1
STEP 2
STEP 3
STEP 4
MVe
®
Tower Retrofit Procedures
MVe_Tower_Owners_Manual-10_09.indd 10
12/4/09 4:21:25 PM