© PCE Instruments
2
2
PCE-TTC 30 Hardware Parts and Accessories
2.1
Unpacking and Inspection
At the factory each new PCE-TTC 30 passes a careful inspection. It should be free of scrapes
and scratches and in proper operation order upon receipt. The receiver should, however, inspect
the unit for any damage that may have occurred during transit. If there are signs of obvious
mechanical damage, package contents are incomplete, or the instrument does not operate
according to specifications, contact the purchasing sales office as soon as possible.
Delivery contents:
1 x Temperature sensor PCE-TTC 30
2 x Laboratory cables with 2 mm plug
1 x Thermocouple adapter to 2 mm plug
2 x Adapter 2 mm on 4 mm laboratory cable
2 x Alligator clips
1 x Mini USB cable
1 x Power supply 5 V / 1 A
1 x Carrying bag
1 x User manual
The software can be downloaded here:
https://www.pce-instruments.com/english/download-
If you have to return the instrument to the factory for any reason, use the original packing
whenever possible. Include a detailed description of the reason for the return.