background image

Figure 4: Operating Instructions, Spark Ignition

63-03 thru 64-08 Natural Gas & LP Gas, 64-09 thru 64-12 LP Gas

Summary of Contents for SERIES 63

Page 1: ...plier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Ne pas ranger ou utiliser de la gazoline ou d autres liquides ou g...

Page 2: ...ion resumes automatically when the system pressure falls below the CUT IN pressure 1b Limit Water Boiler An electrical device that automatically interrupts the boiler operation when the water temperat...

Page 3: ...relief valve can discharge a large amount of steam or hot water the installer should provide piping to discharge water near the floor close to a floor drain If the safety relief valve discharges water...

Page 4: ...4 Figure 2 Sequence of Operation Intermittent Pilot...

Page 5: ...5 Figure 3 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 6: ...Figure 4 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 7: ...ace control access panel if applicable 10 Turn on all electrical power to the appliance 11 Set thermostat or operating control to desired setting 12 If the appliance will not operate follow the instru...

Page 8: ...r a NIOSH MSHA approved respirator Wear long sleeved loose fitting clothing and gloves to prevent skin contact Wear eye goggles Minimize airborne dust prior to handling and removal by water misting th...

Page 9: ...ontinuous to chimney with no separations obstructions or sags Vent pipe must be supported at minimum 4 foot intervals and secured with sheet metal screws 2 The vent system must not have signs of conti...

Page 10: ...Inspection and Maintenance Annual For continued safe operation a qualified service agency must provide a more detailed inspection of burners heat exchanger and vent system and provide maintenance as s...

Reviews: