background image

10

D. Controls (as required by control manufacturer)¹.

1. Safety Relief Valve. Conduct try lever test as outlined in manufacturer’s instruction tag on the

safety relief valve.

2. Low Water Cut-off (if used). Follow instructions provided by control manufacturer.

E. General Inspection and Maintenance (Annual). For continued safe operation a qualified service

agency must provide a more detailed inspection of burners, heat exchanger and vent system, and
provide maintenance as specified in the Installation, Operation and Maintenance Manual.

Figure 6: Pilot and Main Burner Flames

1

Controls maintenance may be part of annual inspection and maintenance by a qualified service agency if annual frequency is 
specified by controls manufacturer.

Summary of Contents for SERIES 63

Page 1: ...plier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Ne pas ranger ou utiliser de la gazoline ou d autres liquides ou g...

Page 2: ...ion resumes automatically when the system pressure falls below the CUT IN pressure 1b Limit Water Boiler An electrical device that automatically interrupts the boiler operation when the water temperat...

Page 3: ...relief valve can discharge a large amount of steam or hot water the installer should provide piping to discharge water near the floor close to a floor drain If the safety relief valve discharges water...

Page 4: ...4 Figure 2 Sequence of Operation Intermittent Pilot...

Page 5: ...5 Figure 3 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 6: ...Figure 4 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 7: ...ace control access panel if applicable 10 Turn on all electrical power to the appliance 11 Set thermostat or operating control to desired setting 12 If the appliance will not operate follow the instru...

Page 8: ...r a NIOSH MSHA approved respirator Wear long sleeved loose fitting clothing and gloves to prevent skin contact Wear eye goggles Minimize airborne dust prior to handling and removal by water misting th...

Page 9: ...ontinuous to chimney with no separations obstructions or sags Vent pipe must be supported at minimum 4 foot intervals and secured with sheet metal screws 2 The vent system must not have signs of conti...

Page 10: ...Inspection and Maintenance Annual For continued safe operation a qualified service agency must provide a more detailed inspection of burners heat exchanger and vent system and provide maintenance as s...

Reviews: