background image

2

Basic Operation

Service on this boiler should be undertaken only by trained and skilled personnel from a
qualified service agency.

Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect the
electrical supply to the pump. Instead, shut off the gas supply at a location external to the
appliance.

Do not use this boiler if any part has been under water. Immediately call a qualified service
agency to inspect the boiler and to replace any part of the control system and any gas control
which has been under water.

A. General. This water boiler is a natural draft appliance and is equipped with controls for proper

operation. All controls must be in proper working order. Contact a qualified service agency to provide
annual maintenance as specified in the Installation, Operation and Maintenance Manual.

B. Control Locations. See Figure 1 for Control and Safety Device Locations.

1a. Limit (Steam Boiler). An electrical device that automatically interrupts the boiler operation when

the steam pressure exceeds the “CUT IN” pressure plus the differential (1 to 5 psi). Maximum
Pressure setting is 14 psig. The set point is usually less than 5 psig.

Original equipment with this boiler is a Honeywell PA404A1009. Boiler operation is interrupted
when the steam pressure exceeds the the “CUT IN” pressure plus the differential. Boiler operation
resumes automatically when the system pressure falls below the “CUT IN” pressure.

1b. Limit (Water Boiler). An electrical device that automatically interrupts the boiler operation when

the water temperature exceeds the set point. Maximum temperature setting is 220°F.

Boiler operation is interrupted when the water temperature exceeds the set point. Boiler operation
resumes automatically when the water temperature falls to approximately 15°F below the set point.

1c. Limit Control may incorporate a low water cut-off feature that will interrupt boiler operation upon

loss of water in the boiler. If the low water cut-off function is activated to interrupt boiler operation,
follow the instructions TO TURN OFF GAS TO THE APPLIANCE (see Figures 3-5) and contact a
qualified service agency.

2. Flame Rollout Switch (FRS). An electrical device that automatically interrupts the boiler operation

when excessive heat is present in the combustion area. The control is a thermal fuse device that
will require replacement if it is activated. If the control has been activated to interrupt the boiler
operation, do not attempt to restart the boiler. Contact a qualified service agency.

3. Blocked Vent Switch (BVS) An electrical device that automatically interrupts the boiler operation

when there is a blockage in the vent pipe or chimney. The control is located on the side of the draft
hood and is a manual reset device. If the control is activated to interrupt operation of the boiler, do
not attempt to restart the boiler. Contact a qualified service agency.

WARNING

CAUTION

Summary of Contents for SERIES 63

Page 1: ...plier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier Ne pas ranger ou utiliser de la gazoline ou d autres liquides ou g...

Page 2: ...ion resumes automatically when the system pressure falls below the CUT IN pressure 1b Limit Water Boiler An electrical device that automatically interrupts the boiler operation when the water temperat...

Page 3: ...relief valve can discharge a large amount of steam or hot water the installer should provide piping to discharge water near the floor close to a floor drain If the safety relief valve discharges water...

Page 4: ...4 Figure 2 Sequence of Operation Intermittent Pilot...

Page 5: ...5 Figure 3 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 6: ...Figure 4 Operating Instructions Spark Ignition 63 03 thru 64 08 Natural Gas LP Gas 64 09 thru 64 12 LP Gas...

Page 7: ...ace control access panel if applicable 10 Turn on all electrical power to the appliance 11 Set thermostat or operating control to desired setting 12 If the appliance will not operate follow the instru...

Page 8: ...r a NIOSH MSHA approved respirator Wear long sleeved loose fitting clothing and gloves to prevent skin contact Wear eye goggles Minimize airborne dust prior to handling and removal by water misting th...

Page 9: ...ontinuous to chimney with no separations obstructions or sags Vent pipe must be supported at minimum 4 foot intervals and secured with sheet metal screws 2 The vent system must not have signs of conti...

Page 10: ...Inspection and Maintenance Annual For continued safe operation a qualified service agency must provide a more detailed inspection of burners heat exchanger and vent system and provide maintenance as s...

Reviews: