Bulletin TI-NITROFLOW60-G
Installation, Operation and Maintenance Manual
NitroFlow60 and NitroFlow60D Generators
www.labgasgenerators.com
8
1-800-343-4048
A03-0286 voltage step-down transformer - If your facility supply voltage is 255V or higher,
then the use of this transformer is required.
A03-0281 voltage step-up transformer - If your facility supply voltage is 195V or lower, then
the use of this transformer is required.
Recommended
Accessories
Figure 11
Figure 12
Check that the power cord of the generator is properly connected to the generator receptacle.
Rotate clockwise to lock. Check that the power cord of the generator is connected to the proper
power supply outlet.
During normal operation, the generator’s power switch is illuminated green. The compressor
pressure gauge indicates a pressure between 115 to 120 psig (7.9 to 8.2 barg). If the pressure
drops below 115 psi, then the nitrogen flow is too high.
Maximum nitrogen pressure should
not exceed 100 psi at the maximum flow rate of 60 slpm.
The compressor operates on a
100% duty cycle (pump on continuously).
The generator has its own automatic water drain system. The 3 filters located on the back of
the generator are equipped with pneumatic drains that open when the water level reaches a
predetermined point. Compressor drain operate every 10 minutes, opens for 2 seconds; the two
internal filter bowls also drain every 10 minutes.
The generator cabinet has two LED indicators (see Figure 13): Power ON, and High Temperature.
The green LED remains illuminated during normal operation. The other LED indicator,
“High Temperature” remains unlit if the compressor is functioning properly. Red illumination
of the High Temperature LED signals a faulty condition and warns the operator that the unit
requires servicing.
Rotate, clockwise, the Power On (see Figure 11) on the front panel of the generator. The
generator will start and the green LED will illuminate. The pressure gauge indicates compressor
pressure. The pressure slowly increases to a maximum set pressure of 125 psig
(8.6 barg). Full pressurization will occur within 10 minutes.
Rotate the nitrogen regulator knob to set the desired outlet pressure as indicated by the nitrogen
output gauge (see Figure 12)
Start-up
Operation
Diagnostics
Operation
Figure 9
Figure 10
POWER