
Once we have completed the 9 Steps (all in
gray at the bottom) and Time has elapsed
from 00:14: 30, it will show or notify that
the Phase has been completed
(!!! COM-
PLETED PHASE !!!)
, so we will stop the en-
gine and automatically start the countdown
timer of 15 minutes to let the engine cool
down.
When the 15 minutes of engine cooling has
elapsed, it will show or notify that the Phase
is complete, the engine is already cold, we
have to press the
“RESTART ALL”
button
and start with another new Phase.
Remember that there are 4 Phases in total.
Once the 4 Phases are completed, we have
already performed the
SHOOTING
of our
engine.
We will continue with the
Second Phase of
Shooting
, Regular Use and we have to per-
form the
First Check
.
111
Summary of Contents for PXP Meter
Page 1: ...PXP METER MANUAL 1 0 https paramotor pxp es...
Page 115: ...Videos 115...
Page 117: ...NOTES 115...