10
1.
NSAA
S.W.P. N-1.10.1-20
STANDARD WORK PROCESS
DATE 2/06/2009
NEB FIELD SUPPORT - (812) 331-5603
Page 8 of 16
This work and the information it contains ( collectively referred to as ‘ W ork’ ) are the confidential property of the Otis E levator Company ( ‘ Otis’ ) . This W ork is delivered on the ex press condition
that: it will be used or reproduced by Otis employees ex clusively for, or on behalf of, Otis; it will not be disclosed, reproduced, or distributed by or to others, in whole or in part, without the
prior written consent of Otis: and, it and any copies will be promptly returned to Otis upon demand or upon termination of employment.
U npublished W ork-8 Copyright 2008, Otis E levator Company
W hile paying attention to proper lifting techniques, place the ceiling on the lift.
Secure the top of the ceiling with the ratchet straps.
Card board scan be used to protect the finish
of the ceiling while on the lift
.
Note:
Before the ceiling is placed on the car, remove the wing nuts securing the emergency
exi t panel. Be sure to secure the exi t hatch to prevent it from opening inadvertently.