5
1.
NSAA
S.W.P. N-1.10.1-20
STANDARD WORK PROCESS
DATE 2/06/2009
NEB FIELD SUPPORT - (812) 331-5603
Page 3 of 16
This work and the information it contains ( collectively referred to as ‘ W ork’ ) are the confidential property of the Otis E levator Company ( ‘ Otis’ ) . This W ork is delivered on the ex press condition
that: it will be used or reproduced by Otis employees ex clusively for, or on behalf of, Otis; it will not be disclosed, reproduced, or distributed by or to others, in whole or in part, without the
prior written consent of Otis: and, it and any copies will be promptly returned to Otis upon demand or upon termination of employment.
U npublished W ork-8 Copyright 2008, Otis E levator Company
Assemble the lift:
NEB - 0 96 H ydraulic Ceiling Lift
Note:
Lock the wheels on the base before beginning the assembly.
Insert the telescopic cylinder frame in the base.
Slide the tabs on the bottom of the cylinder frame
section over the vertical plates on the base.
Note:
The hose fitting will face the base.
Packed Model 294 Lift in Shipping Crate