14
1.
NSAA
S.W.P. N-1.10.1-20
STANDARD WORK PROCESS
DATE 2/06/2009
NEB FIELD SUPPORT - (812) 331-5603
Page 12 of 16
This work and the information it contains ( collectively referred to as ‘ W ork’ ) are the confidential property of the Otis E levator Company ( ‘ Otis’ ) . This W ork is delivered on the ex press condition
that: it will be used or reproduced by Otis employees ex clusively for, or on behalf of, Otis; it will not be disclosed, reproduced, or distributed by or to others, in whole or in part, without the
prior written consent of Otis: and, it and any copies will be promptly returned to Otis upon demand or upon termination of employment.
U npublished W ork-8 Copyright 2008, Otis E levator Company
Before lifting the ceiling, remove the pin and pivot the feet down so the ceiling will rest on the
cab walls.
Remove the pendant station and stand outside the hoistway when lifting the ceiling.