9
1.
NSAA
S.W.P. N-1.10.1-20
STANDARD WORK PROCESS
DATE 2/06/2009
NEB FIELD SUPPORT - (812) 331-5603
Page 7 of 16
This work and the information it contains ( collectively referred to as ‘ W ork’ ) are the confidential property of the Otis E levator Company ( ‘ Otis’ ) . This W ork is delivered on the ex press condition
that: it will be used or reproduced by Otis employees ex clusively for, or on behalf of, Otis; it will not be disclosed, reproduced, or distributed by or to others, in whole or in part, without the
prior written consent of Otis: and, it and any copies will be promptly returned to Otis upon demand or upon termination of employment.
U npublished W ork-8 Copyright 2008, Otis E levator Company
Open the door on the pumping unit and connect the battery
M easure the width of the ceiling. The bottom telescoping arms should be set at ½ of the width
of the ceiling from the centerline of the cradle.
Safety Note: Always keep the ceiling centered on the pivot point of the cradle.
Safety note: Always assemble the cab at the lowest landing