
24
Connecting to the DTE (Router or FRAD)
Procedure
1.
Connect one end of the DTE’s V.35 cable to the data port.
2.
Plug the other end of the cable into the DTE.
3.
Tighten the screws on each side of the connector to secure them.
4.
Verify that the Port OK LED is on. If it is, the port is set up correctly and is
operational. If not, make sure both ends of the cable are properly seated and
secured. Then, check the DTE; RTS or DTR could be down on the DTE.
5.
Check Health and Status messages in the left column of the System and Test
Status screen for messages.
Main Menu
→
Status
→
System and Test Status
—
If
System Operational
appears, the port interface is set up correctly and is
operational.
—
If not, refer to
Status Information in the FrameSaver SLV Operations Guide.
NOTE:
When any error conditions are detected, a status message appears along the
bottom right corner of the screen.
POWER
COM
DBM
MDM
NET
99-16480
DTE
Summary of Contents for FrameSaver SLV 9626
Page 35: ...35 ...