2. BitStorm 1900 Installation and Testing
2-44
BitStorm 1900 Installation and Maintenance Guide
1900-A2-GN20-00
Figure 2-5: BitStorm 1900 Modem Shelves Mounted in Bay
4.)
Using the shelf mounting screws provided in the shelf hardware kit,
fasten the left and right flanges to the bay as shown in Figure 2-6,
"BitStorm 1900 Shelf Fastened to Bay," on page 45.
Mid-Mount
Flush-Mount
02-17177
Summary of Contents for BitStorm IP DSLAM 1900
Page 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...