2. BitStorm 1900 Installation and Testing
1900-A2-GN20-00
BitStorm 1900 Installation and Maintenance Guide
2-43
Step
Procedure
1.)
Select and apply grounded anti-static protection.
2.)
Select the mounting point in the bay where the top holes of the
shelf mounting flanges will be attached.
3.)
Align the holes of the shelf mounting flanges with the mounting
holes in the bay as shown in Figure 2-5, "BitStorm 1900 Modem
Shelves Mounted in Bay."
WARNING: ELECTROSTATIC DISCHARGE! Anti-static
protection required! The BitStorm 1900
shelves are shipped with the circuit packs
installed. When handling any circuit pack,
you must wear grounded anti-static
protection. The discharge of static electricity
can damage the circuit packs.
!
WARNING: POSSIBLE EQUIPMENT DAMAGE! Installa-
tion Requirement! For a single-shelf
application without a Fan Tray, be sure to
leave at least three inches of space above
and below the BitStorm 1900 shelves to
dissipate heat.
Summary of Contents for BitStorm IP DSLAM 1900
Page 12: ...List of Tables viii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 16: ...About This Document xii BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...
Page 48: ...1 BitStorm 1900 IP DSLAM 1 32 BitStorm 1900 Installation and Maintenance Guide 1900 A2 GN20 00...