
Troubleshooting
8-15
9820-A2-GB20-20
June 2000
Starting and Stopping a Test
Use this procedure to start, monitor, or abort specific tests. To abort all active
tests on all interfaces, see
Aborting All Tests
.
When the status of a test is . . .
The only command available is . . .
Inactive
Start
Active
Stop
Start or stop an individual test using the same procedure.
"
Procedure
To start and stop a test:
1. Follow this menu selection sequence:
Main Menu
→
Test
2. Select an interface to be tested (Network or Data Port PVC Tests, or Data
Port Physical Tests) and press Enter.
The selected test screen appears.
Start
appears in the Command column.
Inactive
appears in the Status column.
3. Select the DLCI number and press Enter if a PVC test has been selected.
The cursor is positioned at Start in the Command column of the first available
test. Start is highlighted.
4. Highlight the Start command for the test you want to start and press Enter.
Stop now appears and is highlighted, and the status of the test changes to
Active.
5. Press Enter to stop the test.
Start reappears and the status of the test changes back to Inactive.
6. View the length of time that the test has been running in the Result column.
Summary of Contents for 9820
Page 10: ...Contents viii 9820 A2 GB20 20 June 2000...
Page 98: ...Configuration Options 4 62 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Page 216: ...Menu Hierarchy A 4 9820 A2 GB20 20 June 2000 This page intentionally left blank...
Page 246: ...SNMP MIBs and Traps and RMON Alarm Defaults B 30 9820 A2 GB20 20 June 2000...
Page 266: ...Technical Specifications D 4 9820 A2 GB20 20 June 2000...
Page 270: ...Equipment List E 4 9820 A2 GB20 20 June 2000 This page intentionally left blank...