7. Operation and Maintenance
9128-A2-GB20-80
September 2002
7-41
Call Status
(continued)
Connected – Outbound
Call
1
An outbound call has been placed
and is actively connected and
available for data transfer on the
selected multilink constituent link
(when the Most Recent Cause
Value is
Call Awarded and
Being Delivered In Est
Chnl-7
).
Most Recent Cause
Value
3
Various ITU cause
messages
Refer to
Table 7-14, Most Recent
and Previous Cause Value
Messages
, for additional information.
Previous Cause
Values
3
Maximum Link Rate
(Kbps)
BRI DBM:
64K, 128K
PRI DBM:
64K, 128K, . . . 1472
The maximum link rate that was
configured for the selected link. This
is the maximum rate the link will
attempt to achieve when activated.
Negotiated Rate
(Kbps)
64K per B-channel
56K per B-channel
The negotiated rate of the
connection/link.
For a multilink aggregate frame relay
link, the negotiated rate will be the
sum of the negotiated rates on all
connected constituent links.
ISDN Channel
BRI DBM:
B1, B2
PRI DBM:
B1, B2, . . . B23
The ISDN B-channel being used for
the call on this link.
Remote Call ID
3
None
Backup has never been active on
the link.
Remote device’s ID
Remote call origination – Last
Calling ID of the remote backup
device received for the B-channel. If
the remote device initiated the call,
this is the Inbound Call ID. If this
device originated the call, this is the
Outbound Phone Number.
Table 7-13. DBM Interface Status (3 of 3)
Field
Status
What It Indicates
1
Only appears for a constituent frame relay link.
2
If Link Operating Mode is Disabled or Idle, the Remote Call ID, ISDN Channel, and
Negotiated Rate fields will not appear.
3
Appears for frame relay links with only one constituent and for all constituent frame
relay links.
Summary of Contents for 9126
Page 150: ...4 Configuration Options 4 106 September 2002 9128 A2 GB20 80 ...
Page 182: ...6 Security and Logins 6 16 September 2002 9128 A2 GB20 80 ...
Page 264: ...7 Operation and Maintenance 7 82 September 2002 9128 A2 GB20 80 ...
Page 348: ...A Menu Hierarchy A 4 September 2002 9128 A2 GB20 80 ...
Page 440: ...E Connectors Cables and Pin Assignments E 18 September 2002 9128 A2 GB20 80 ...