81
14.6 Dry Concrete [SERVICE MODE: 03]
If Dry Concrete has been set, Dry Concrete status can be activated and monitored by following procedure.
1 Press SERVICE button for 5 seconds.
2 Press ▲ to enter menu Sr: 03 and press SET button to activate Dry Concrete function.
3 Press OFF/ON button to quit setting.
14.7 EEPROM Factory Default Data Setup Procedure
1 This process should be done at Gemstar (and/or) PAPAMY as the last process after any inspection.
2 This condition should be activated by pressing combination of few SW's for certain time as shown.
These 3 SW's should press continuously for 5secs.
(Operation should be OFF during this period)
3 When this condition is activated, default data should be written in EEPROM.
4 Once the default data is written in the EEPROM, the following full LCD display should be ON for 2secs for
confirmation. After 2secs, it goes back to normal display.
OPERATION
ACTUAL
Summary of Contents for WH-MHF09G3E8
Page 32: ...32 10 1 2 Solar Printed Circuit Board Optional ...
Page 33: ...33 10 2 Refrigerant System 10 2 1 Main Printed Circuit Board ...
Page 34: ...34 10 2 1 1 Noise Filter Printed Circuit Board ...
Page 47: ...47 Heat Mode Operation Time Chart ...
Page 49: ...49 ...
Page 50: ...50 ...
Page 56: ...56 ...
Page 57: ...57 ...
Page 58: ...58 ...
Page 127: ...127 17 3 To Remove The Cabinet Rear Plate 17 4 To Remove Pressure Gauge 17 5 To Remove RCCB ...
Page 138: ...138 19 2 Water System 44 46 17 16 4 34 42 18 43 3 33 9 1 45 45 47 2 35 48 36 19 ...