Conduit
Remove junction box cover and secure conduit or
stress relief to the opened knock-out hole.
Refer to wiring diagram (P.5), follow all the local electrical safety
codes as well as the National Electrical Code (NEC). Using UL
approved wire nuts, connect house power wires to ventilating
fan wires.
Mount junction box cover
carefully so that lead wires are
not pinched.
Finish ceiling work. Ceiling hole should be aligned
with the inside edge of the flange.
Connect wires
3
Adaptor
Junction
box cover
Knock-out hole
Circular
duct
Mastic or
approved
foil tape
3
1
Finish ceiling work
1
Unit: inches (mm)
After finishing the ceiling job, fill gap between
flange and ceiling with caulk or other sealant
to prevent air leakage.
1
7
INSTALLATION I (JOIST MOUNTING) (CONTINUED)
AC 120 V 60 Hz
LINE IN