60
Electrical Wiring
Section F
Connections
No.
Name
In / Out
Allocation
Function
Comments
10 M2-6
(FREE)
I
GRY
Advanced & Medium: Activation of
demand control
Remove bridge for use of demand
control (if bridge is intact and in place,
temperature setpoint control is active)
9 M2-5
I
ORG
Advanced & Medium: Activation of
demand control
8 M2-4
I
WHT
Advanced & Medium: Analogue input
Demand
Advanced & Medium: Negative poten-
tial (–10 V DC) for demand control
7 M2-3
I
RED
Advanced & Medium: Analogue input
Demand
Advanced & Medium: Analogue input
(+10 V DC) for demand control
6 M2-2
I/O
RED
Advanced only: Analogue output
Advanced only: Internal potential
(+10 V DC) from TR-16/TR-16e via
bridge
5 M2-1
O
WHT
Advanced only: Analogue output
Advanced only: Internal potential
10 V DC from TR-16/TR-16e via
bridge
4 E2-2 /
E3-2
I
No polarity
Sensor E2 / TH3 (PACi) or
Sensor E3 / TH4 (ECOi), respectively
3 E2-1 /
E3-1
I
No polarity
2 E1-2
I
No polarity
Sensor E1 / TH2
1 E1-1
I
No polarity
Terminal layout – PAW-T10 (for advanced and light versions only)
PAW-T10 PCB
Connections
No.
In / Out
Allocation
Function
Comments
1
I (1)
Potential for I (2)
External Start / Stop
2
I (2)
ON / OFF
3
I (3)
Lock RC
Lock (Contact closed) or
Unlock (Contact open) remote control-
ler, respectively
4
I (4)
Potential for I (3)
5
O (5)
Operation Signal NC
Operation Signal as normally open or
normally closed contact
External Potential:
max. 250 V AC / 5 A
6
O (6)
Operation Signal NO
7
O (7)
Potential for O (5) and O (6)
8
O (8)
Alarm Signal NC
Alarm Signal as normally open or
normally closed contact
External Potential:
max. 250 V AC / 5 A
9
O (9)
Alarm Signal NO
10
O (10)
Potential for O (8) and O (9)
Important
For details about the connection and functions of the PAW-T10 PCB, please refer to the separa-
te installation instructions for PAW-T10.
i
Summary of Contents for PAW-160MAH2
Page 3: ...Air Handling Unit Kit Installation Instructions SET AL1 OUT ATU PV SV ºC ºC ...
Page 4: ......
Page 99: ...97 ...
Page 100: ...Notes ...
Page 101: ...Notes ...