Carry-in/Installation
Foundation/Platform Work
● As a reference, the foundation should be made from concrete having a mass about 3 times that of the
refrigeration unit. (Absorbing vibration by mass)
● Vibration should be reduced by a platform or anti-vibration pad for avoiding transmission of vibration to the floor and wall.
● To avoid falling, secure the refrigeration unit by using anchor bolts. (Use all securing positions)
● The refrigeration unit must be installed with an inclination angle 1° or below.
● The refrigeration unit must be installed below the altitude of 2,000 m.
If a foundation meeting the requirement above cannot be secured, be sure to check that no abnormal vibration is
generated by resonation of the refrigeration unit and piping system.
(1) Basic foundation work when the pipe is extended horizontally.
On a concrete foundation 150 mm or higher from the floor surface, place anti-vibration pads (Approx. 8 to 15 mm
thick) and secure the unit on the entire unit base by anchor bolts.
(2) Basic foundation work when the pipe is extended downward.
Form an elevated foundation with vertical columns.
Place an anti-vibration pad (thickness of 8 to 15 mm) on the entire surface of the foundation and secure it with
anchor bolts.
(3) Anchor bolts
Use M8 size anchor bolts and buried at least 100 mm on the concrete foundation.
Fix unit with double nut and plain washer (28 mm O.D. minimum).
External Dimensions
270mm
52mm
Optional Accessories
The following service piping (optional) is required for the installation and
service work of the refrigeration unit.
Service piping for Evacuation, Airtight test, and Refrigerant charging
(Model No. SPK-TU125)
(Units: mm)
AIR
AIR
AIR
AIR
(295)
106
700(installation pitch)
882
91
91
890
10
4-φ20hole
Refrigeration fixing
885
851(installation pitch)
245
70
150
60
Power supply hole
122
588
540
230
224
1941
194
890
226
Suction
(φ19.05 Outer diameter connection)
Liquid
(φ15.88 Outer diameter connection)
48
61
122
Details of piping hole
on the bottom of the
refrigeration unit
Left side of refrigeration unit
Front of refrigeration unit
Right side of refrigeration unit
Liquid
Suction
Connected to the unit service valve
Nut (fastening torque 13 ± 1 N·m)