52
9. Remove the Ottoman base cover with care to five Hooks
on right and seven Hooks on left.
10. Remove four screws each on right/left sides, which install
the Rotation shaft, and remove the Ottoman.
11. Pull out the tip of the zippers and cut Cable ties, and open
the zippers. Remove five J-shaped hooks and open the
Cover.
Caution
• When in assembly, pass the tips of the zippers though
the hole of the rubber. Bind the left tip of the zippers with
a Cable tie.
12. Remove four screws and remove the Cushion.
13. Pull out the tip of the zippers and cut Cable ties, and open
the zippers.
14. Remove six screws, which install the Foot under cover,
and remove the Cover.
Summary of Contents for EP-MA73
Page 4: ...4 3 Location of Controls and Components 3 1 Massage Lounger ...
Page 5: ...5 ...
Page 7: ...7 3 3 Display ...
Page 8: ...8 4 Operating Instructions 4 1 Turning on the Power ...
Page 22: ...22 6 Troubleshooting Guide 6 1 Checking ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 30: ...30 ...
Page 31: ...31 ...
Page 32: ...32 ...
Page 33: ...33 ...
Page 35: ...35 ...
Page 39: ...39 7 Service Fixture Tools ...
Page 40: ...40 8 AIR 8 1 Air tube allocation Main body ...
Page 41: ...41 8 2 Air tube allocation Ottoman ...
Page 42: ...42 8 3 Air tubes and Wiring Connecting cord for powr source Sub PCB Power source switch box ...
Page 43: ...43 8 4 Ottoman hose allocation ...
Page 72: ...72 9 23 Grease ...
Page 73: ...73 ...
Page 75: ...75 10 Exploded View and Replacement Parts List ...
Page 76: ...76 10 1 Exploded View 1 ...
Page 77: ...77 10 2 Exploded View 2 ...
Page 78: ...78 10 3 Exploded View 3 ...
Page 79: ...79 10 4 Exploded View 4 ...
Page 80: ...80 10 5 Exploded View 5 ...
Page 81: ...81 10 6 Exploded View 6 ...
Page 82: ...82 10 7 Exploded View 7 ...