Section 300-Installation
Chapter 4. Trunks and Lines
DBS-2.3/9.2-300
DBS Manual - Revised April 2000
4-39
Ringer box installation with the DBS 72 and DBS 96
SLT Ringer Box
(VB-2089P)
-48V
RG
SYN RG
+24V
Z0
GND
M
Z2
C
B
Z1
Z3
RE2
Z4
RE1
SG
CN2
RG
(BRN)
+24V
RG
SYN
(RED)
GND
CN12
CN11
CN4
CN3
CN2
CN15
CN6
CN1
CN1
CN5
SLT R ingerBox
(VB -2089P)
SG
R G
SYN
R G +24V
Z0
G N D
C
Z2
B
M
Z1
Z3
R E2
Z4
R E 1
-48V
C N 2
C N 11
C N 12
C N 5
C N 13
C N 3
C N 14 CN15
C N 1
C N 1
C N 2
C N 4
R G
(BR N )
+24V
R G
SYN
(R ED )
G N D
Ringer box installation with the DBS 40
Summary of Contents for DBS 40
Page 12: ...About This Manual Section 300 Installation xii DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 20: ...2 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 30: ...3 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 50: ...4 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 94: ......
Page 96: ...5 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 132: ...6 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 144: ...7 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 204: ...Index Section 300 Installation Index 8 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...