Section 300-Installation
Chapter 3. Cabinet Installation
DBS-2.3/9.2-300
DBS Manual - Revised April 2000
3-5
Grounding
Guidelines
• Before grounding the DBS, read the “Lightning Protection/Grounding”
requirements beginning on page 1-6.
• The ground cable must be at least 18 AWG.
• Resistance to ground must be 10 Ohms or less.
Installation
1. Attach the ground cable to the ground screw on the front of the power
supply.
2. Connect the ground cable to the building ground.
Figure 3-4. Cabinet ground screw
C N 11
C N 12
C N 13
C N 14
C N 6
SW 1
C N 3
TRK1
TRK2
TRK3
EC1
EC2
EC3
EC4
EC5
EC6
EC7
EC8 EC/TRK
SCC
CPC
AUX1
AUX2
C N 5 C N 4
C N 2
C N 1
G round Screw
Summary of Contents for DBS 40
Page 12: ...About This Manual Section 300 Installation xii DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 20: ...2 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 30: ...3 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 50: ...4 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 94: ......
Page 96: ...5 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 132: ...6 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 144: ...7 2 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...
Page 204: ...Index Section 300 Installation Index 8 DBS Manual Revised April 2000 DBS 2 3 9 2 300 ...