19
3. For the embedded piping
Install accessory of tube ass’y
1. Remove chassis back particular piece.
2. Connect tube ass’y to gas side piping. Liquid side
piping need to pull out to joint tube ass’y.
3. Set the piping direction.
(For bottom piping, need to perform cutting and flaring
process.)
4. Use 2 spanner to tighten the nut. (tighten torque 65 N
●
m)
5. Check gas leakage at joint area.
6. Cover the open tubing with the foam and bind it by
band
.
7. Close back the chassis back piece.
Summary of Contents for CS-V28EKE CU-V28EKE
Page 8: ...8 4 Location of Controls and Components Indoor Unit Outdoor Unit Remote Control ...
Page 9: ...9 5 Dimensions 5 1 Indoor Unit Remote Control ...
Page 10: ...10 5 2 Outdoor Unit ...
Page 11: ...11 6 Refrigeration Cycle Diagram ...
Page 12: ...12 7 Block Diagram ...
Page 13: ...13 8 Wiring Connection Diagram ...
Page 14: ...14 9 Printed Circuit Board 9 1 Indoor Unit BOTTOM VIEW ...
Page 15: ...15 TOP VIEW ...
Page 16: ...16 9 2 Indicator And Receiver BOTTOM VIEW TOP VIEW ...
Page 20: ...20 This can be used for left rear piping and left bottom piping also ...
Page 43: ...43 15 Technical Data 15 1 Thermostat Characteristics ...
Page 45: ...45 15 3 Operation Characteristics 15 3 1 CS V28EKE CU V28EKE ...
Page 46: ...46 ...