2. Confirmation/Alignment of Intermediate Gear B, Main Cam Gear,
and Intermediate Gear A
A. Confirm that the Hole A on Lift Gear is a Through Hole with a
hole on chassis.
B. Confirm that the hole on Intermediate Gear A is aligned with the
hole on Lift Gear.
Fig. J3-3
C. Install the Intermediate Gear B so that the hole on the
Intermediate Gear B is aligned with the hole on the Main Cam
Gear.
Fig. J3-4
3. Holes on Main Cam Gear
A. The EJECT mode Hole on Main Cam Gear should be a Through
38
Summary of Contents for AG527DVDE - DVD/VCR/MONITOR
Page 1: ...ORDER NO MKE0206606C1 D1 TV DVD VCR Combination AG 527DVDE SPECIFICATIONS 1 ...
Page 28: ...Fig D2 28 ...
Page 29: ...Fig D3 29 ...
Page 30: ...6 1 1 1 Notes in chart 1 Removal of VCR DVD Ass y Fig D4 30 ...
Page 34: ...6 2 3 EJECT Position Confirmation Fig J1 2 34 ...
Page 35: ...6 2 4 Full Erase Head and Cylinder Unit Fig J2 35 ...
Page 76: ...76 ...
Page 79: ...11 2 MECHANISM BOTTOM SECTION 79 ...
Page 80: ...11 3 CASSETTE UP COMPARTMENT SECTION 80 ...
Page 81: ...11 4 CHASSIS FRAME SECTION 1 81 ...
Page 82: ...11 5 CHASSIS FRAME SECTION 2 82 ...
Page 83: ...11 6 CHASSIS FRAME SECTION 3 83 ...
Page 84: ...11 7 PACKING PARTS AND ACCESSORIES SECTION 84 ...
Page 101: ...C3038 ECEA1CKA100 ELECTROLYTIC 16V 10UF 101 ...