![Palazzetti P1 Installation Instructions, Use And Maintenance Download Page 42](http://html1.mh-extra.com/html/palazzetti/p1/p1_installation-instructions-use-and-maintenance_3309730042.webp)
KIT L1: PRODUCT DESCRIPTION
500
450
1
2
3
4
6
7
8
9
11
12
13
14
40
60
120
60
170
100
60
160
A
B
D
E
1. System return tap with anti-return
¾”M
2. System delivery tap
¾”M
3. System circulation pump
GRUNDFOS UPM3
4. Generator circulation pump
GRUNDFOS UPM3
5. Anti-condensation
valve
/
6. System return probe
17&.ȍ#
7. System air vent
fast
8. Generator air vent
fast
9. Plate exchanger
40 plates
10. Generator delivery probe
/
11. Control unit
TC 100
12. Generator delivery tap
¾”M
13. Generator return tap
¾”M
14. Metal box
Painted in white
A) Return from heating circuit
¾”M
B) Delivery to heating circuit
¾”M
D) Return to generator
¾”M
E) Delivery from generator
¾”M
&RQ¿JXUDWLRQGHODFHQWUDOH&)*
42