13
Palax D410 Pro+
Translation
1-2020
Acceptance and setting up the machine for operation
State of delivery and acceptance control
The machine is delivered almost ready-assembled, test driven and adjusted ready for operation.
heck the delivered goods without delay.
If the product shows transport damage, contact the transport company and your dealer
immediately.
Lifting and transferring the machine
The machine may be lifted by the following points, see Fig. 2, all models.
By means of a sling or chain by the lifting points A at the ends of the machine.
Using a forklift truck, by points B on both sides, under the frame.
Figure 2