MR05660
9
INSTALLATION & SET-UP
WARNING! READ MANUAL PRIOR TO INSTALLATION
Improper installation, operation, or maintenance of this equipment could result in
serious injury or death. Operators and maintenance personnel should read this
manual, as well as all manuals related to this equipment and the prime mover
thoroughly before beginning installation, operation, or maintenance.
FOLLOW ALL
SAFETY INSTRUCTIONS IN THIS MANUAL AND THE PRIME MOVER'S
MANUAL(S).
1.
Place this product on a firm, level surface that is large enough to safely accommodate this
product, your prime mover and all workers involved in the mounting process.
2.
Refer to the operator’s manual(s) for your prime mover, loader, and quick-attach and follow the
mounting instructions contained therein.
3.
Carefully raise the loader and cycle the tilt cylinders to check clearances and to verify that all
mounting procedures have been successfully completed.
IMPORTANT
Lubricate all grease fittings before connecting this product to your prime
mover's hydraulic system. Refer to COLD PLANER MAINTENANCE page and
follow the instructions.