www.packardbell.com
79
11
Connect the modem cable to the new modem board, and then attach to board
to its system board connector.
12
Secure the new modem board with the screw removed in
step 9
.
13
Reinstall the palm rest by performing steps
19
–
21
of the
“Replacing the palm
rest”
procedure on
page 68
.
14
Reinstall the LCD panel assembly by following the steps
16
–
23
of the
“Replacing the LCD panel assembly”
procedure on
page 64
.
15
Reinstall the keyboard and the keyboard cover by performing steps
5
–
8
of
the
“Replacing the keyboard”
procedure on
page 62
.
16
Close the LCD panel and turn the notebook over so the base is facing up.
17
Reinstall the optical drive by performing steps
10
and
11
of the
“Replacing
the optical drive”
procedure on
page 56
.
18
Reinstall the hard drive by performing steps
8
and
9
of the
“Replacing the
hard drive”
procedure on
page 54
.
19
If you have disconnected any wireless antennas, reconnect them now.
20
Reinstall the bay cover.
21
Reinstall the battery.
Summary of Contents for ENTJ75
Page 1: ...ENTJ75 ENTJ76 ENTJ77 ENTJ78 SERVICEGUIDE ...
Page 6: ...Contents iv ...
Page 12: ...CHAPTER 1 System specifications 6 System block diagram ...
Page 48: ...CHAPTER 2 System utilities 42 ...
Page 140: ...CHAPTER 4 Troubleshooting 134 ...
Page 141: ...CHAPTER5 135 Connector locations System board layout ...
Page 145: ...CHAPTER6 139 FRU Field Replaceable Unit list Introduction Exploded diagram FRU list ...
Page 152: ...CHAPTER 6 FRU Field Replaceable Unit list 146 ...
Page 153: ...APPENDIXA 147 Test compatible components Introduction Microsoft Windows 7 Compatibility Test ...
Page 156: ...APPENDIX A Test compatible components 150 ...
Page 157: ...APPENDIXB 151 Online support information ...
Page 163: ......
Page 164: ...MAN NV5x SVC GDE R1 04 09 ...