SECTION 3
INSTALLATION
21
SECTION 3
INSTALLATION
3 INSTALLATION
This section describes installation of an UPC into a SCU.
NOTE:
It is recommended that the user return the product to the factory should a controller or power
source upgrade be desired, however, the following information is provided for reference. Refer to the
power source manual for installation into a Pacific Power Source, Inc. power source system. Should a
question arise, call Pacific Power Source, toll free, at 1-800-854-2433.
WARNING
THIS EQUIPMENT CONTAINS HIGH ENERGY, LOW IMPEDANCE CIRCUITS!!
LETHAL POTENTIALS ARE CONTAINED WITHIN THE CABINET.
DO NOT REMOVE ANY PANELS OR COVERS WITHOUT FIRST REMOVING
THE INPUT SERVICE POWER AND OPENING ALL CIRCUIT BREAKERS.
CAUTION
-
Read Section 3, INSTALLATION, before installing or operating this
equipment.
Installation of an UPC into a SCU consists of the following steps:
STEP DESCRIPTION
REFERENCE
1
Open all Circuit Breakers and remove Input Service
paragraph 3.1
2
Remove cover and cabling
paragraph 3.2
3
Remove existing controller
paragraph 3.3
4
Install UPC
paragraph 3.4
5
Install cabling and cover
paragraph 3.5
6
Connect Input Service and power on
paragraph 3.6
7
Configure UPC
paragraph 3.7
!
!
Summary of Contents for UPC-1
Page 2: ......
Page 12: ...SECTION 1 GENERAL viii THIS PAGE INTENTIONALLY BLANK ...
Page 17: ...SECTION 1 GENERAL 5 PACIFIC Figure 1 3a SCU UPC 3 Figure 1 3b UPC 3 Figure 1 3c UPC 1 ...
Page 43: ...SECTION 4 OPERATION 31 PA CIFIC FIGURE 4 1 POWER SOURCE FRONT PANEL ...
Page 74: ...SECTION 4 OPERATION 62 90 0 100 0 85 95 100 90 FIGURE 4 6 2 1 EDITED WAVEFORM ...
Page 134: ...NOTES 122 NOTES ...