10
PACIFIC FP30 190712-28
FP30
45"
44"
30 3/4"
11 1/4"
21 7/8"
28 1/8"
29 1/2"
25"
Dimensions
Clearances
This heater must be installed with a listed compatible chimney
system listed on page 15.
Clearances to combustible surfaces and materials are shown
on pages 12, 13 & 14.
Clearances may be reduced with various heat insulating
materials. Consult local, National fi re codes and authorities
for approval.
Procedure:
Note: See "Combustion Air" section on page 17.
MAINTAIN CLEARANCES TO COMBUSTIBLES AS SPECI-
FIED IN THE INSTALLATION INSTRUCTIONS
CAUTION: THE STRUCTURAL INTEGRITY OF THE FLOOR,
WALL AND CEILING/ROOF MUST BE MAINTAINED.
THE SPACE HEATER MUST BE CONNECTED TO A FAC-
TORY-BUILT CHIMNEY CONFORMING TO CAN/ULC-S629
AND UL 103HT STANDARDS FOR 650C FACTORY-BUILT
CHIMNEYS.
1. Position stove and fl oor protection in accordance with the
clearances as stated on the label and in these installation
instructions.
2. Mark the position for the hole for the chimney in the ceiling
and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with fl oor
joists, ceiling joists or rafters before proceeding further.
4 Assemble the framing kit as per instructions on page 11.
Secure the framing kit to the top of the unit with three
#8X1/2" sheet metal screws (Fig.#7) or use steel studs
for the entire vertical section. The framing kit should be
fl ush with the front of the fi replace. Frame in the fi replace
in accordance with the framing clearances stated on page
12. Anchor the Framing kit to the wood framing on the
sides and top.
FIG. #8
FIG. #7
NOTE: Combustible materials cannot be used in the space
directly above the fi replace. Do not fi ll the space above the
fi replace with any material up to the ceiling. (except the
wood framing)
The fi replace must not be in contact with any insulation
or loose fi lling material. Cover the insulation with drywall
panels around the fi replace.
Summary of Contents for PACIFIC FP30
Page 26: ...26 PACIFIC FP30 190712 28...