OUTPUT PLANET CARRIER
DISASSEMBLY
1. Remove the planet gears by driving the roll pins into
the center of the planet shafts.
2. Use a punch to drive the roll pins from the planet
shafts. Do not reuse the roll pins.
3. Now you can remove the planet shafts, bearings,
spacer, thrust washers and gears. Thoroughly clean
all parts and inspect for damage and wear. The
bearing rollers should not exhibit any irregularities.
If the rollers show any sign of spalling, corrosion,
discoloration, material displacement or abnormal
wear, the bearing should be replaced. Likewise, the
cage should be inspected for unusual wear or defor-
mation, particularly the cage bars. If there is any
damage that will impair the cage’s ability to sepa-
rate, retain and guide the rollers properly, the bear-
ing should be replaced. The thrust washer contact
areas should be free from any surface irregularities
that may cause abrasions or friction. The gears and
shafts should be inspected for abnormal wear or
pitting. Replace if necessary.
ASSEMBLY
1. Place the output planet carrier on workbench with
splined coupling side down. Install output thrust
plate in center of carrier.
2. Insert two (2) bearings and a bearing spacer into a
gear with the spacer between the bearings. Place a
thrust washer on each side of the gear and position
in a carrier opening. Slide the shaft through the car-
rier, thrust washer, bearing-gear sub-assembly and
remaining thrust washer.
PLANETARY CARRIER SERVICE
17