VZR.235900.000 IG
Cube С-04 Turnstile
Installation Guidelines
32
6 INTEGRATED INSPECTION
6.1
Inspecting and checking the product’s readiness for use
6.1.1
Check that the turnstile’s parts and assemblies are tightly fastened
6.1.2
Make sure all cables are secure.
6.1.3
Switch on the turnstile’s power supply and check for serviceability
by making some test passages.
6.1.4
With no foreign noise and any operating disturbances, the turnstile
is ready for operation.